Zobrazeno 1 - 10
of 19
pro vyhledávání: '"Jiyong Choi"'
Publikováno v:
Engineering Proceedings, Vol 36, Iss 1, p 44 (2023)
Road sign support systems are not usually well managed, because bridges and pavements have budget and maintenance priority while the sign boards and sign supports are considered miscellaneous items. The authors of this paper developed a simple deteri
Externí odkaz:
https://doaj.org/article/64eea5ffbb574a3cbe752ec72886f965
Publikováno v:
Engineering Proceedings, Vol 36, Iss 1, p 46 (2023)
Reducing the quantities of engineered materials provides a significant opportunity to mitigate the environmental impacts caused by material production and processing. Although the efficient use of materials in building construction has been emphasize
Externí odkaz:
https://doaj.org/article/4316dc9a24a04ec0b68b248753e23b23
Publikováno v:
Water Supply, Vol 21, Iss 4, Pp 1495-1505 (2021)
The purpose of this study was to investigate the relationship between stream water quality and the surface runoff rate defined as the ratio of annual surface runoff to annual average precipitation. The surface runoff rate was first estimated in the H
Externí odkaz:
https://doaj.org/article/4ea3f25ef3ed418781527a92705f4bb6
Publikováno v:
Water Supply, Vol 21, Iss 4, Pp 1495-1505 (2021)
The purpose of this study was to investigate the relationship between stream water quality and the surface runoff rate defined as the ratio of annual surface runoff to annual average precipitation. The surface runoff rate was first estimated in the H
Publikováno v:
Polymers; Volume 15; Issue 7; Pages: 1736
For anion exchange membrane water electrolysis (AEMWE), two types of anion exchange membranes (AEMs) containing crosslinked poly(phenylene oxide) (PPO) and poly(styrene ethylene butylene styrene) (SEBS) were prepared with and without triazole. The im
Publikováno v:
Journal of Management in Engineering. 38
Publikováno v:
Journal of the Korean Society of Propulsion Engineers. 24:73-78
Publikováno v:
Applied Surface Science. 610:155601
BIM-based benchmarking system for healthcare projects: Feasibility study and functional requirements
Publikováno v:
Automation in Construction. 96:262-279
While project benchmarking based on key performance indicators is regarded as a crucial technique for mature project delivery in the construction industry, incorporating it into an organization's routine is a cumbersome and time-consuming endeavor as
Publikováno v:
Building and Environment. 216:108984