Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Jin-Xiu Yuan"'
Autor:
Wei-Hua Han, Mei-Qin Wang, Jin-Xiu Yuan, Chun-Cheng Hao, Cheng-Jie Li, Yun-Ze Long, Seeram Ramakrishna
Publikováno v:
Arabian Journal of Chemistry, Vol 15, Iss 11, Pp 104193- (2022)
Electrospinning (e-spinning) is famous for the construction and production of ultrafine and continuous micro-/nanofibers. Then, the alignment of electrospun (e-spun) nanofibers becomes one of the most valuable research topics. Because aligned fibers
Externí odkaz:
https://doaj.org/article/fa5a853400e34cec91786567a3cd9607
Publikováno v:
Shock and Vibration, Vol 2020 (2020)
It has generally been believed that the serious seismic damage of tunnel mainly occurred in portal section and fault dislocation zone. However, the survey of seismic damage showed that the seismic damage of tunnel also mainly occurred in geological s
Externí odkaz:
https://doaj.org/article/eb4e72de8d8647cf82b4e0c52407a542
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Cancer Medicine; Aug2024, Vol. 13 Issue 16, p1-10, 10p
Publikováno v:
Energy Technology. 10:2100885
Publikováno v:
Materials Science Forum. 873:84-88
In order to explore a smart carrier which can control drug delivery in special pH environment, a type of nanometer material, namely, poly acrylic acid acrylamide (P(AA-AM)) was synthesized with acrylic acid and acrylamide as monomers. Its structure w
Publikováno v:
Applied Mechanics and Materials. :1684-1687
It has been a technical problem of upward movement for shield tunnel segment during construction. a segment floating calculation formula was deduced through using basic theory of mechanics and mathematics, detailed tension analysis of segment. The co
Publikováno v:
Advanced Materials Research. :1341-1345
Beijing subway line 6 crossing under the existing line 4 is the first domestic method of using the mined tunnels crossing under the existing interval shield tunnel, during the crossing process, the key of engineering control is the displacement of ex