Zobrazeno 1 - 8
of 8
pro vyhledávání: '"Jielian Zheng"'
Autor:
Jielian Zheng
Publikováno v:
Engineering, Vol 41, Iss , Pp 110-129 (2024)
Arch bridges provide significant technical and economic benefits under suitable conditions. In particular, concrete-filled steel tubular (CFST) arch bridges and steel-reinforced concrete (SRC) arch bridges are two types of arch bridges that have gain
Externí odkaz:
https://doaj.org/article/6f39a99b2b534ab5b691d893da8bd120
Autor:
Jielian Zheng, Jianjun Wang
Publikováno v:
Engineering, Vol 7, Iss 4, Pp 542- (2021)
Externí odkaz:
https://doaj.org/article/23c2d52317c74d618b5448d31d33afb8
Autor:
Jielian Zheng, Jianjun Wang
Publikováno v:
Engineering, Vol 4, Iss 1, Pp 143-155 (2018)
In the past 20 years, great progress has been achieved in China in the construction of concrete-filled steel tube (CFST) arch bridges and concrete arch bridges with a CFST skeleton. The span of these bridges has been increasing rapidly, which is rare
Externí odkaz:
https://doaj.org/article/59d1918baac241ed8361a4ef3bf0a284
Publikováno v:
Advances in Materials Science and Engineering, Vol 2020 (2020)
Zangmu Bridge is a concrete-filled steel tube (CFST) arch bridge along the Sichuan-Tibet railway in Tibet, with a main span of 430 m. Owing to the unique temperature conditions in Tibet, there have been no large-scale experimental studies on the ther
Externí odkaz:
https://doaj.org/article/20fa8bf72b744716b6bb70c4ac097b42
Autor:
Dayan Qin Civil Eng., Guoxiong Mei Prof., Jiaping Liu Prof., Hailong Du Civil Eng., Tingmin Mu Civil Eng., Bing Tu Dr, Jielian Zheng Prof.
Publikováno v:
Structural Engineering International. 32:134-141
Publikováno v:
Advances in Materials Science and Engineering, Vol 2020 (2020)
Zangmu Bridge is a concrete-filled steel tube (CFST) arch bridge along the Sichuan-Tibet railway in Tibet, with a main span of 430 m. Owing to the unique temperature conditions in Tibet, there have been no large-scale experimental studies on the ther
Autor:
Bing Tu, Jielian Zheng
Publikováno v:
IABSE Congress, Nanjing 2022: Bridges and Structures: Connection, Integration and Harmonisation.
The main bridge of the Pingnan Third Bridge is a half-through concrete-filled steel tubular (CFST) arch bridge with a world-largest effective span of 560 m. Due to the significant breakthrough in span and the adverse environmental features of constru
Autor:
Jielian Zheng
This present book mainly introduces the latest advancements in design and construction technologies of large-span concrete-filled steel tubular (CFST) arch bridges and steel-reinforced concrete (SRC) arch bridges with a CFST rigid skeleton. The main