Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Ji-Yong Ding"'
Publikováno v:
Buildings, Vol 13, Iss 4, p 989 (2023)
Based on the analytical framework of the Theory of Planned Behavior (TPB), this paper decomposed the driving factors under institutional logic and technological logic, and empirically tested the driving path of the low-carbon behavior (LCB) of contra
Externí odkaz:
https://doaj.org/article/0d293ca894f04e76b82216a7ffd3212f
Publikováno v:
Water Science and Engineering, Vol 5, Iss 3, Pp 340-349 (2012)
Levees are affected by over-exploitation of river sand and river adjustments after the formation of sand pits. The slope stability is seriously threatened, drawing wide concern among experts and scholars in the area of water conservancy. This study a
Externí odkaz:
https://doaj.org/article/fc9e3a1e0fa34c54ad7f80f50c4fef62
Publikováno v:
電腦學刊. 33:069-081
This article mainly solves the problems that exist when using the Kernel Correlation Filter (KCF) for tracking in complex scenarios. To make the algorithm suitable for target tracking under complex conditions such as scale changes, similar interferen
Autor:
sup> 天津科技大学生物工程学院,天津 ,, Ji-Yong Ding, Hongchen Shen, Li Li, sup> 天津科技大学海洋与环境学院,天津 ,, Fufeng Liu, sup> 天津大学化工学院生物工程系,天津 ,
Publikováno v:
Acta Physico-Chimica Sinica. 32:2620-2627
Publikováno v:
Mathematical Problems in Engineering, Vol 2016 (2016)
Two financing modes can be considered for manufacturer’s production capital constrained: RPFM (retailer’s prepayment financing mode) and PCFM (procurement contract financing mode). Under the RPFM, the retailer places order in advance for a discou
Publikováno v:
ICCREM 2013.
As an alternative project delivery method (PDM) to the traditional Design-Build-Bid (DBB), Design-Build (DB) has seen expanded application in construction industry for two decades. Up to now, it has been a mainstream delivery method for construction
Publikováno v:
Water Science and Engineering, Vol 5, Iss 3, Pp 340-349 (2012)
Levees are affected by over-exploitation of river sand and river adjustments after the formation of sand pits. The slope stability is seriously threatened, drawing wide concern among experts and scholars in the area of water conservancy. This study a