Zobrazeno 1 - 10
of 13
pro vyhledávání: '"Jessica Sandberg"'
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. :1-14
Integral bridges are preferred on infrastructure schemes as they have lower maintenance costs than a conventional jointed bridge. A key aspect of integral bridge design is the assessment of long-term passive resistance that develops in the abutment b
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 175:73-83
The River Dee Bridge is a 270 m long concrete box girder bridge constructed as part of the Aberdeen Western Peripheral Route. The detailed design commenced in 2014, with construction finishing in late 2018. The bridge has a mainspan of 120 m and was
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 175:84-94
This paper sets out the challenges from the perspective of the designer associated with the construction of the River Dee Bridge built by the balanced cantilever method. The importance of managing the construction sequence and its impact on both the
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 174:195-204
The UK's design documents for assessment of steel and composite highway bridges and structures have been updated in line with Highways England's overall plan for modernising the Design Manual for Roads and Bridges. This paper describes the key change
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 174:219-230
The repair and management of Britain's concrete highway structures has significantly improved since the publication of specific guidance in 1990 in the UK Design Manual for Roads and Bridges (DMRB) This guidance was updated in 2020 to include an impr
Autor:
Eduardo Júlio, Eduardo Cavaco, Stefano Agnetti, Eftychia Apostolidi, Francesco Bencardino, Antonio Bilotta, Vanessa Buchin-Roulie, Stefan L. Burtscher, Susana Cabral Fonseca, Valter Carvelli, Ju Chen, Long Chen, Luís Correia, António Costa, José Paulo Costa, Roberto Cuzzilla, Charles Cynober, Christoph Czaderski-Forchmann, Gianmarco De Felice, Marco Di Ludovico, Filipe Dourado, Stephanos Dritsos, Alberto Dusi, João Farinha, Ran Feng, Christos Giarlelis, Luís Guerreiro, Renata Kotynia, Jakob Kunz, Nicholas Kyriakides, Jan Laco, Andreas Lampropoulos, Luis Lima, Kay Loeffler, Gaetano Manfredi, Giorgia Martinelli, Alejandro Mateos, Jon Moseley, Raquel Paula, Alexandre Pinto, Andrea Prota, Marc Quiertant, João Ramôa Correia, Norbert Randl, Constantinos Repapis, Theodoros Rousakis, Jessica Sandberg, Jacob Schmidt, José Sena Cruz, Takumi Shimomura, Meini Su, Thanasis Triantafillou, Antonio Trimboli, Tamon Ueda, Alois Vorwagner, Shengnian Wang, Zhongwen Wang, Feng Xing, Dawei Zhang, Ji-Hua Zhu, Ivica Zivanovic
Publikováno v:
fib Bulletins ISBN: 9782883941571
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::6f0e1e8b383efefd53b6ebde14d8cb3c
https://doi.org/10.35789/fib.bull.0103
https://doi.org/10.35789/fib.bull.0103
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 173:112-120
The Heathrow expansion project proposals comprise major works around Heathrow airport to allow the construction of new terminal buildings and the third runway. Owing to the critical nature of uninterrupted operation of both runway and the M25 motorwa
Autor:
Helena Nyström, Michael Haney, Jessica Sandberg, Helge Brändström, Göran Johansson, Marcus Fredriksson Sundbom
Objective We assessed the mortality risk related to the time for intensive care unit transport in a geographically large regional health care system. Methods Patient-level data from critical care ambulance missions were analyzed for 2,067 cases, miss
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b1169d3532282109c5b6ed34cc731e2c
http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-189651
http://urn.kb.se/resolve?urn=urn:nbn:se:umu:diva-189651
Publikováno v:
Proceedings of the Institution of Civil Engineers - Bridge Engineering. 171:222-234
The Highways England A14 Cambridge to Huntingdon Improvement Scheme consists of both online improvements to existing sections of the A14 and a new offline section constructed on a green field site bypassing Huntingdon, UK. The scheme includes the des