Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Javier M. Canon"'
Publikováno v:
Day 1 Mon, May 02, 2016.
The industry is good at identifying risks, but in some instances is less proactive in ensuring the effectiveness and robustness of risk mitigating barriers. This becomes critical in deepwater Flow Assurance (FA) operations as latent threats, such as
Autor:
Javier M. Canon, Sarah Yau, Aurea Francisco, Knut Even Lundsbakken, BP Angola, Morten Espeland
Publikováno v:
All Days.
This paper summarizes practical experiences after 2 years of use of an online multiphase flow transient simulator in an operating deepwater blackoil field offshore Angola. FAMS (Flow Assurance Management System) is based on state of the art thermal-h
Publikováno v:
All Days.
In this paper we describe the possibility and benefits of incorporating the stability analysis of the proppant pack during the design stage of hydraulic fracturing treatments. After the well is treated and cleaned up, the flowback of proppant from a