Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Jang Jeng Liu"'
Publikováno v:
Journal of Civil Engineering and Management, Vol 20, Iss 4 (2014)
Design delays can negatively influence the total completion time of a facility construction project. Knowing the factors to which design delays are most sensitive supports the time management of designs. However, factors that cause design delays are
Externí odkaz:
https://doaj.org/article/83d40f4150b742a39f0d496387a84fb2
Publikováno v:
Applied Mechanics and Materials. :1160-1169
Many probabilistic scheduling models have been developed to determine the duration of construction projects. However, these models are not appropriate to capture the effect of the factors that are involved construction interface problems on the durat
Publikováno v:
Automation in Construction. 15:589-603
Enhancing the scheduling of a design project can markedly reduce its total duration. However, accurately representing the schedule of a design project is complex, largely owing to that design activities generally depend on information about each othe
Publikováno v:
Automation in Construction. 15:341-354
Construction accidents often lead to project delays. However, in practice, construction safety and schedule control are managed separately. This work develops an innovative simulation-based model, SimSAFE, that assesses the hazard (or expected accide
Autor:
Jang Jeng Liu, Wei-Chih Wang
Publikováno v:
International Journal of Project Management. 23:109-120
Current practice separates subcontractor management from schedule control. A factor-based model is proposed to measure the sensitivity of each factor to uncertainty by decomposing the effects of uncertainty at the level of activity, and then integrat
Autor:
Ming Tsung Lee, Yuan Yuan Cheng, Abdoul Aziz Gansonre, Jang Jeng Liu, Wei-Chih Wang, Shih Hsu Wang, Wen Shuo Chan, Kun Chi Wang, Shih Yu Shih, Ming Feng Yeh
Publikováno v:
Proceedings of the International Symposium on Automation and Robotics in Construction (IAARC).
In recent years, the construction industry has been actively seeking for possible applications of Building Information Modeling (BIM), including the domain of building disaster-prevention management. BIM enables us to present a facility layout in thr
Publikováno v:
Journal of Civil Engineering and Management; Vol 20 No 4 (2014); 497-510
Journal of Civil Engineering and Management, Vol 20, Iss 4 (2014)
Journal of Civil Engineering and Management, Vol 20, Iss 4 (2014)
Design delays can negatively influence the total completion time of a facility construction project. Knowing the factors to which design delays are most sensitive supports the time management of designs. However, factors that cause design delays are
Autor:
Wei-Chih Wang, Jang Jeng Liu
Publikováno v:
Automation and Robotics in Construction ― Proceedings of the 24th International Symposium on Automation and Robotics in Construction.
Although slightly improving the control of the design schedule may greatly reduce the total duration of the project, but little effort has been made to control the schedule of the design project. Scheduling design activities is complicated chiefly be
Publikováno v:
Proceedings of the 21st International Symposium on Automation and Robotics in Construction.
Improving the scheduling of the design project can greatly reduce the total duration of the project. However, appropriately representing the schedule of a design project is complicated chiefly because the design activities often have different degree
Autor:
Wei-Chih Wang1 weichih@mail.nctu.edu.tw, Jang-Jeng Liu1 sandro.cv88g@nctu.edu.tw
Publikováno v:
International Journal of Project Management. Feb2005, Vol. 23 Issue 2, p109-120. 12p.