Zobrazeno 1 - 5
of 5
pro vyhledávání: '"James P. Jerome"'
Work undertaken in 2001 included: (1) 3335 structure posts were pounded on six new projects thereby protecting 10 miles of stream (2) Completion of 1000 ft. of barbed wire fence and one watergap on the Middle Fork of the John Day River/ Forrest prope
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::803705446c2b9c70accfd9c89a210a7b
https://doi.org/10.2172/877193
https://doi.org/10.2172/877193
During 1998, three new projects were completed improving 1.8 miles of stream and riparian habitat. Protection for these reaches required the construction of 3.2 miles of riparian fence and 7 livestock water gaps. A previously leased property on the M
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::e6b825f88d4c5660a7087597676d9a6b
https://doi.org/10.2172/10168
https://doi.org/10.2172/10168
The purpose of the John Day Fish Habitat Enhancement Program is to enhance production of indigenous wild stocks of spring chinook and summer steelhead within the subbasin through habitat enhancement and access improvement. The John Day River system s
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ca1cd3c95f16cea76f4c3034dcba5749
https://doi.org/10.2172/10177611
https://doi.org/10.2172/10177611