Zobrazeno 1 - 10
of 52
pro vyhledávání: '"James E. Rowings"'
Publikováno v:
Cost Engineering. Nov97, Vol. 39 Issue 11, p8. 1/2p. 1 Black and White Photograph.
Publikováno v:
Journal of Construction Engineering and Management. 143
Publikováno v:
Journal of Construction Engineering and Management. 126:169-175
Construction education is not new. It was a part of the practical aspects of many early civil engineering degree programs. As early as the 1920's, specializations in construction engineering were found in a few civil engineering programs, paralleling
Publikováno v:
Journal of Construction Engineering and Management. 126:15-21
This paper reports on a project sponsored by the Electrical Contracting Foundation that examined the design/build (D/B) approach and the various dimensions of the decision process that electrical contractors consider before entering this emerging mar
Autor:
Rifat Sonmez, James E. Rowings
Publikováno v:
Journal of Construction Engineering and Management. 124:498-504
Construction labor productivity is affected by several factors. Modeling of construction labor productivity could be challenging when effects of multiple factors are considered simultaneously. In this paper a methodology based on the regression and n
Autor:
James E. Rowings, David J. Harmelink
Publikováno v:
Journal of Construction Engineering and Management. 124:263-268
There are several reasons why linear scheduling techniques have not been applied widely to construction projects even though they have been identified as very useful. If we consider the capabilities and the widespread use of critical-path method (CPM
Publikováno v:
Journal of Construction Engineering and Management. 122:83-90
The heart of the competitiveness in the U.S. construction industry has always been the skilled workforce that has been available to implement the technology of construction. During the late 1980s, ...
Autor:
Daji Gong, James E Rowings
Publikováno v:
International Journal of Project Management. 13:187-194
One of the criticisms of the pert/cpm technique is that it ignores the uncertainty influence of noncritical activities on project-duration estimation. As a result of this problem, the pert/cpm technique gives an optimistic estimation of project durat
Publikováno v:
Journal of Construction Engineering and Management. 119:105-114
A study was conducted to examine the problems created by the mismatch between supply and demand for construction craftworkers. The paper identifies that the supply and demand varies greatly by geographic region and should be analyzed by region. This
Publikováno v:
Journal of Management in Engineering. 8:192-207
The Engineering Management Activities Committee solicited opinions and wishes on preferable learning nodes, topics of interest, and conference preferences relative to civil engineering management. Of 5,000 questionnaires distributed through The Engin