Zobrazeno 1 - 6
of 6
pro vyhledávání: '"Jamal Alblooshi"'
Autor:
Rail Salimov, Benoit Jaffres, Jamal Alblooshi, Arlen Sarsekov, Maxim Chirkov, Humaid Al Kuwaiti
Publikováno v:
Day 3 Wed, November 02, 2022.
Long term development planning requires infill drilling. Due to limited number of slots in offshore environment new drillings centers (Well Head Towers) are required. Optimized location of drilling center can have big impact on reducing drilling expe
Publikováno v:
Day 3 Wed, November 02, 2022.
In offshore field due to pessimistic design in one of the field, water injection flowmeters are not capable to measure full potential injection rates. Highly precise Virtual Metering methodology was developed in-house to estimate rates real-time usin
Autor:
Michael Nevin, Mattheus Uijttenhout, Hiren Kasekar, Usama Ghauri, Elyes Draoui, Jamal Alblooshi, Raphaele Mel
Publikováno v:
Day 2 Tue, November 10, 2020.
The ADNOC Offshore oilfield located in the Arabian Gulf is being developed utilising various wellhead towers, infield pipelines and a standalone super complex. The field development team devised an updated subsurface plan to achieve production target
Publikováno v:
Day 1 Mon, November 09, 2020.
ADNOC Offshore started-up full field gas-lift activation for the first time in 2020. This major step will unlock field's potential by increasing reservoir withdrawal and increasing wells life by mitigating water production / breakthrough. This paper
Autor:
J. Adam Donald, Salem Al-Jaberi, Bader Saif Al-Badi, Chaitanya Deenadayalu, Elyes Draoui, Julian Guerra, J. Wesley Martin, Magdalena Povstyanova, Guifen Xi, Jamal Alblooshi, Eudes Siqueira Muniz, Norka Marcano Balliache
Publikováno v:
Day 4 Thu, November 12, 2020.
Frequent drilling challenges for high-inclination well paths in the overburden Laffan and Nahr-Umr shales involve stuck pipe incidents and caving, leading to sidetracking in extreme cases. Advanced geomechanics studies including both an anisotropic w
Publikováno v:
All Days.
This paper covers the integrated approach performed in one of the major oil fields in off-shore Abu Dhabi to increase the confidence level in this tight heterogeneous reservoir development. This paper outlines the challenges that were faced along wit