Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Jaber, Adel A."'
Publikováno v:
2022 2nd International Conference on Advance Computing and Innovative Technologies in Engineering (ICACITE).
Based on the IEC 60270 guideline, a galvanic quantification along with free-space radiometry (FSR) method are used to measure partial discharge (PD) simultaneously. The PD source is a floating-electrode emulator type that was custom built. Sources ar
Autor:
Altayef, Ehsan, Jaber, Adel, Anayi, Fatih, Zhang, Fan, Dhabaa, Shaima L., Hassan, Eheda, Eltaief, Abdurrhman, Sama, Bdereddin Abdul
Publikováno v:
ACM International Conference Proceeding Series; 9/14/2020, p1-7, 7p
Autor:
Jaber, Adel, Lazaridis, Pavlos, Moradzadeh, Mohammad, Glover, Ian, Zaharis, Zaharias D., Vieira, M F Q, Judd, M, Atkinson, R
The present study addresses the calibration of four types of partial discharge (PD) emulators used in the development of a PD Wireless Sensor Network (WSN). Three PD emulators have been constructed: a floating-electrode emulator, and two internal PD
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=core_ac_uk__::cefc02e1af12752ccd0fc1fa0011a122
https://eprints.hud.ac.uk/id/eprint/33786/1/08120358.pdf
https://eprints.hud.ac.uk/id/eprint/33786/1/08120358.pdf
Autor:
Upton, David, Saeed, Bakhtiar I., Khan, Umar, Jaber, Adel, Mohamed, H., Mistry, Keyur, Mather, Peter, Lazaridis, Pavlos, Vieira, M F Q, Atkinson, R., Tachtatzis, Christos, Iorkyase, E. T., Judd, M., Glover, Ian
Publikováno v:
URSI GASS 2017
Monitoring of partial discharge (PD) activity\ud within high voltage electrical environments is frequently used for the assessment of insulation condition. Traditional measurement techniques employ technologies that require either offline installatio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=core_ac_uk__::ec99996db532272a8d0ed0f417c718fe
https://eprints.hud.ac.uk/id/eprint/33159/1/Paper_C2-2(2789).pdf
https://eprints.hud.ac.uk/id/eprint/33159/1/Paper_C2-2(2789).pdf
Autor:
Jaber, Adel Ali
Measurement of partial discharge (PD) is an important tool in the monitoring of insulation integrity in high voltage (HV) equipment. Partial discharge is measured traditionally using galvanic contact techniques based on IEC 60270 standard or near fie
Externí odkaz:
http://ethos.bl.uk/OrderDetails.do?uin=uk.bl.ethos.732910
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Autor:
Neto, Jose Mauricio, Zhang, Yong, Jaber, Adel, Zhu, M, Judd, Martin, Atkinson, Robert, Soraghan, John, Neto, Jose Sergio, de Fatima Q Vieira, Maria, Glover, Ian A
Publikováno v:
2014 XXXIth URSI General Assembly & Scientific Symposium (URSI GASS); 2014, p1-4, 4p
Autor:
Jaber, Adel Ali
Measurement of partial discharge (PD) is an important tool in the monitoring of insulation\ud integrity in high voltage (HV) equipment. Partial discharge is measured traditionally using\ud galvanic contact techniques based on IEC 60270 standard or ne
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=core_ac_uk__::006232203efd56ef4e76034c99f570f6