Zobrazeno 1 - 10
of 11
pro vyhledávání: '"J. M. Dalin"'
Autor:
H. Prin, F. Bordry, D. Bodart, Cedric Garion, J. M. Dalin, Ch. Scheuerlein, P. Cruikshank, J. Ph. Tock, K. Dahlerup-Petersen, Frederic Savary, Mirko Pojer, Nicolas Bourcey, S Atieh, R. Ostojic, A. Perin, Z. Charifoulline, Andrea Musso
Publikováno v:
IEEE Transactions on Applied Superconductivity. 26:1-6
The first Large Hadron Collider (LHC) Long Shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13-kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center
Autor:
L. Bottura, J.-P Tock, Paolo Fessia, P Thonet, H. Prin, L Williams, Christian Scheuerlein, F. Bertinelli, H Pfeffer, S. Heck, R H Flora, J. M. Dalin
The main busbar interconnection splices of the Large Hadron Collider are assembled by inductive soldering of the Rutherford type cables and the copper profiles of the stabilizer. Following the September 2008 incident, the assembly process and the qua
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::93d47b19d0b10a205147584722bc4195
http://cds.cern.ch/record/1379836
http://cds.cern.ch/record/1379836
Autor:
N. Kos, F. Bertinelli, F. Ruggiero, B. Angerth, Fritz Caspers, C. Reymermier, O. Gröbner, J.-C. Brunet, A. Poncet, P. Cruikshank, T. Sholz, Stefano Sgobba, J. M. Dalin, A. G. Mathewson, E. Wallen, R Calder
Publikováno v:
Proceedings Particle Accelerator Conference.
The two rings of the LHC beam vacuum system have a total length of about 54 km of which almost 48 km will be at 1.9 K, the temperature of the superconducting magnets. The total synchrotron radiation power emitted by the two beams is 0.41 Wm/sup -1/.
Autor:
F. Bordry, D. Bodart, J. Ph. Tock, A. Perin, Cedric Garion, Nicolas Bourcey, Frederic Savary, J. M. Dalin, K. Dahlerup-Petersen, R. Ostojic, S Atieh, Mirko Pojer, Andrea Musso, Christian Scheuerlein, P. Cruikshank
Publikováno v:
Journal of Physics: Conference Series. 507:032050
The first LHC long shutdown (LS1) started in February 2013. It was triggered by the need to consolidate the 13 kA splices between the superconducting magnets to allow the LHC to reach safely its design energy of 14 TeV center of mass. The final desig
Autor:
J.-M. Dalin, P. Cruikshank, F. Bertinelli, I. Sexton, K. Artoos, R. Calder, B. Feral, R. Veness, O. Gröbner, Stefano Sgobba, R. Valbuena, I. Collins, A. Mathewson, A. Poncet, I. Nikitine, G. Schneider, L. Nikitina, J.C. Brunet, N. Kos, C. Campedel, C. Reymermier
Forty-four kilometers of the LHC beam vacuum system will be equipped with a perforated co-axial liner, the so-called beam screen. Operating between 5 K and 20 K, the beam screen reduces heat loads to the 1.9 K helium bath of the superconducting magne
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::74db406e23c4ac4d237798f5586fd3cf
http://cds.cern.ch/record/330853
http://cds.cern.ch/record/330853
Publikováno v:
IEEE Transactions on Applied Superconductivity. 22:7800104-7800104
When energized, the ITER Central Solenoid coils experience large pulsed electromagnetic forces that the conductor jacket itself must withstand. The conductor jacket consists of circle-in-square extruded and drawn austenitic stainless steel pipes. The
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.