Zobrazeno 1 - 1
of 1
pro vyhledávání: '"J. L. Gilby"'
Publikováno v:
International Journal of Mining and Geological Engineering. 6:147-162
The initial phase of the Donkin-Morien project involves the driving of two parallel tunnels through an interbedded sequence of coal measures strata to intersect the Harbour Seam which lies approximately 3.5 km offshore. The No. 2 tunnel was driven a