Zobrazeno 1 - 10
of 16
pro vyhledávání: '"Isa Nakhai Kamal Abadi"'
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 24, Iss 4, Pp 277-286 (2013)
We model a real-world case problem as a price competition model between two leader-follower supply chains that each of them consists of one manufacturer and one retailer. T he manufacturer produces partially differentiated products and sells to marke
Externí odkaz:
https://doaj.org/article/3fe2f6af0f8541108d52f76729f00464
Publikováno v:
مدیریت تولید و عملیات, Vol 3, Iss 2, Pp 41-58 (2013)
In this paper, the problem of received order scheduling by a manufacturer, with the measure of maximum completion times of orders, has been formulated and then an analytical approach has been devised for its solution. At the beginning of a planning p
Externí odkaz:
https://doaj.org/article/78a4b433b0de449d981f9bce0be6a66d
Publikováno v:
Energy Sources, Part B: Economics, Planning, and Policy. 11:651-664
Millions of dollars are annually allocated by governments to subsidize refined fuels, which results in fake low prices. Therefore, corrective measures such as privatization and gradual reduction of subsidies have been taken in some countries, includi
Autor:
Isa Nakhai Kamal Abadi, Hadi Mokhtari
Publikováno v:
Computers & Operations Research. 40:1234-1242
This paper addresses a single-stage scheduling problem with outsourcing allowed where each job can be either scheduled for in-house production or outsourced to one of the outside subcontractors available. The manufacturer has an unrelated parallel ma
Publikováno v:
Neurocomputing. 101:190-203
This paper presents a general kind of flow shop scheduling problem in a manufacturing supply chain where a group of jobs can be processed on a machine simultaneously. Examples of such environment occur in chemical processes, semiconductor industries,
Publikováno v:
International Journal of Production Research. 50:5906-5925
In classical scheduling problems, it is often assumed that the machines are available during the whole planning horizon, while in realistic environments, machines need to be maintained and therefore may become unavailable within production periods. H
Publikováno v:
International Journal of Production Research. 50:5372-5395
When market demand exceeds the company's capacity to manufacture, outsourcing is commonly considered as an effective alternative option. In traditional scheduling problems, processing of received orders is just possible via in-house resources, while
Autor:
Reza Maihami, Isa Nakhai Kamal Abadi
Publikováno v:
Mathematical and Computer Modelling. 55(5-6):1722-1733
In this paper we consider a joint pricing and inventory control model for non-instantaneously deteriorating items with permissible delay in payments. We adopt a demand function which is dependent on the price and time. Shortage is allowed and partial
Publikováno v:
Advanced Materials Research. :1506-1512
Economic evaluation of macro projects requiring a high volume of investment is one of important issues in the area of financial research. To deal with this problem, a great number of models such as direct operating cost, discounted cash flow analysis
Autor:
Reza Maihami, Isa Nakhai Kamal Abadi
Publikováno v:
Advanced Materials Research. :6607-6615
In this paper, dynamic pricing and ordering policy for non-instantaneous deteriorating items is developed. Shortage is allowed and partially backlogged where as the backlogging rate is variable and dependent on the waiting time for the next replenish