Zobrazeno 1 - 10
of 81
pro vyhledávání: '"Irtishad Ahmad"'
Publikováno v:
Buildings, Vol 12, Iss 4, p 489 (2022)
The construction industry has been incorporating digital technology over the last two decades, albeit gradually, as “technology-push” continues to overcome customary and traditional passivity typical in the sector. The objective of the study pres
Externí odkaz:
https://doaj.org/article/e803e0b1eb004063ad279bd9389d9ed2
Autor:
Sameh El-Sayegh, Irtishad Ahmad, Malak Aljanabi, Rawan Herzallah, Samuel Metry, Omar El-Ashwal
Publikováno v:
Buildings, Vol 10, Iss 10, p 171 (2020)
Claims and disputes occur frequently in the construction industry between different contracting parties, mainly the owner, the designer and the contractor. Consequently, valuable time and a significant amount of money are lost. The United Arab Emirat
Externí odkaz:
https://doaj.org/article/1f187ad2488640ea85dc3f87249203f4
Publikováno v:
Engineering, Construction and Architectural Management. 27:609-633
Purpose The public nature of water and wastewater construction capital projects has rendered design-bid-build (DBB) as the delivery method of choice for such projects over the past years. Shortcomings inherent to DBB have had a negative effect on the
Publikováno v:
Handbook of Disaster Risk Reduction for Resilience ISBN: 9783030612771
Communities around the world are looking for ways to provide reliable and cost-effective infrastructure services to end users. Sustainable and resilient infrastructures are the demands of the day. Both public and private sectors demand resilient and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::237a1732900fe74beedb7d55412fa057
https://doi.org/10.1007/978-3-030-61278-8_15
https://doi.org/10.1007/978-3-030-61278-8_15
Autor:
Malak Aljanabi, Rawan Herzallah, Samuel Metry, Omar El-Ashwal, Irtishad Ahmad, Sameh M. El-Sayegh
Publikováno v:
Buildings
Volume 10
Issue 10
Buildings, Vol 10, Iss 171, p 171 (2020)
Volume 10
Issue 10
Buildings, Vol 10, Iss 171, p 171 (2020)
Claims and disputes occur frequently in the construction industry between different contracting parties, mainly the owner, the designer and the contractor. Consequently, valuable time and a significant amount of money are lost. The United Arab Emirat
Publikováno v:
Journal of Management in Engineering. 36
A water supply system is a key infrastructure providing critical services to city-dwellers. Due to major disaster events causing a water shortage, the supply systems can be vulnerable. This...
Autor:
Sharmila Pant, Rick Vallier, Irtishad Ahmad, Ehssan Amir Sayyafi, Khaled Sobhan, Nakin Suksawang, John A. Corven
Publikováno v:
Transportation Research Record: Journal of the Transportation Research Board. 2672:34-43
Epoxy grout pourbacks at end anchorages of post-tensioning tendons provide an essential level of corrosion protection. The tendon may fail because of strand corrosion, within a few years of installation, if it is not properly protected with epoxy gro
Publikováno v:
Journal of Management in Engineering. 35
Publikováno v:
Journal of Management in Engineering. 35
Autor:
Salman Azhar, Irtishad Ahmad
Construction organizations typically deal with large volumes of project data containing valuable information. It is found that these organizations do not use these data effectively for planning and decision-making. There are two reasons. First, the i
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ec0b7e5a32d022037df20af601872ef4
https://doi.org/10.25148/etd.fi14032386
https://doi.org/10.25148/etd.fi14032386