Zobrazeno 1 - 10
of 15
pro vyhledávání: '"Ighor Uzhinsky"'
Publikováno v:
Applied Sciences, Vol 10, Iss 23, p 8541 (2020)
Blade damage accounts for a substantial part of all failure events occurring at gas-turbine-engine power plants. Current operation and maintenance (O&M) practices typically use preventive maintenance approaches with fixed intervals, which involve hig
Externí odkaz:
https://doaj.org/article/3f82ff001d4b4efb80a035dd0a83d128
Publikováno v:
International Journal of Turbomachinery, Propulsion and Power, Vol 5, Iss 4, p 29 (2020)
This paper presents a methodology for predictive and prescriptive analytics of a gas turbine. The methodology is based on a combination of physics-based and data-driven modeling using machine learning techniques. Combining these approaches results in
Externí odkaz:
https://doaj.org/article/c3a5afce82464feb890ccde400654e56
Autor:
Viktor Rakhmatulin, Miguel Altamirano Cabrera, Fikre Hagos, Oleg Sautenkov, Jonathan Tirado, Ighor Uzhinsky, Dzmitry Tsetserukou
Publikováno v:
2021 IEEE International Conference on Systems, Man, and Cybernetics (SMC).
Modern industry still relies on manual manufacturing operations and safe human-robot interaction is of great interest nowadays. Speed and Separation Monitoring (SSM) allows close and efficient collaborative scenarios by maintaining a protective separ
Autor:
Eldar Shakirov, A. John Hart, Kaitlyn Gee, Clement Fortin, Haden Edward Quinlan, Ighor Uzhinsky
Additive Manufacturing (AM) — one of several core digital technologies in “Industry 4.0” — is increasingly being deployed in industrial-scale contexts. The successful serial production of end-use polymer and metal components has demonstrated
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::2ea2db5997128bfa7f33731402990e3f
https://doi.org/10.1115/1.0002361v
https://doi.org/10.1115/1.0002361v
Autor:
Udo Lindemann, Ighor Uzhinsky, Harald Bauer, Niklas Kattner, Eldar Shakirov, Felix Brandl, Clement Fortin, Lucia Becerril, Gunther Reinhart
Publikováno v:
Procedia CIRP. 81:535-540
Manufacturing companies nowadays face difficulties due to inefficient change management in domains as engineering, manufacturing, logistics, etc. Even though there are powerful software solutions and process-based methods available, it is uncertain h
Publikováno v:
Applied Sciences, Vol 10, Iss 8541, p 8541 (2020)
Applied Sciences
Volume 10
Issue 23
Applied Sciences
Volume 10
Issue 23
Blade damage accounts for a substantial part of all failure events occurring at gas-turbine-engine power plants. Current operation and maintenance (O&
M) practices typically use preventive maintenance approaches with fixed intervals, which in
M) practices typically use preventive maintenance approaches with fixed intervals, which in
Publikováno v:
2020 IEEE Aerospace Conference.
Plasma thruster operating with high-density helicon source is expected to mitigate the problems of the finite lifetime of electric thrusters and shows a possibility to be incorporated in spacecraft for long-duration interplanetary missions. Helicon w
Publikováno v:
IFIP Advances in Information and Communication Technology ISBN: 9783030422493
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ce020fa0f85877bedde51d0c24d93ec4
https://doi.org/10.1007/978-3-030-42250-9_39
https://doi.org/10.1007/978-3-030-42250-9_39
Publikováno v:
IFIP Advances in Information and Communication Technology ISBN: 9783030422493
PLM
PLM
The methodology for prescriptive maintenance of complex technical systems is presented. The proposed methodology is based on a hybrid physics-based and data-driven modelling of complex systems. This approach integrates traditional physics-based simul
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::9f6b6b455cfce8e2c3c4c9ba09a5a38b
https://doi.org/10.1007/978-3-030-42250-9_36
https://doi.org/10.1007/978-3-030-42250-9_36
Publikováno v:
International Journal of Product Lifecycle Management. 13:1
Engineering change management (ECM) makes up a large portion of overall product development effort and provokes significant uncertainty in planning and executing the product development operations. By enabling better planned ECMs, practitioners can i