Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Ibraheem M. Al-Ageel"'
Publikováno v:
Day 3 Wed, January 31, 2018.
This paper describes a new procedure/technique which was used to control wells with high upward crossflow. The procedure was successfully deployed in four wells at different occasions. The subject wells, located in brown fields, are tubingless water
Autor:
Mohammed D. Al-Ajmi, Nasser M. Al-Hajri, Abdulrahman T. Mishkes, Ibraheem M. Al-Ageel, Mohammed M. Nekhily, Fehead M. Al-Subaie
Publikováno v:
All Days.
This paper will outline the events associated with Well-A integrity diagnostics, which took place prior to and during workover operations. Well-A tubing was pulled out and inspected by the workover rig. The results of workover operations assessment h
Autor:
Ibraheem M. Al-Ageel, Mohammed D. Al-Ajmi, Nasser M. Al-Hajri, Fehead M. Al-Subaie, Saleh R. Al-Mujaljil
Publikováno v:
All Days.
Saudi Aramco has used gravity water injectors extensively as a reservoir pressure maintenance means to support oil production from a mature field. Gravity water injectors in Field-A are perforated in a highly productive and shallow water producing aq
Autor:
Ayoub Hadj-Moussa, Abdulaziz Sallim Al Mutawa, Muhammad Abdul Muqeem, Nelson O. Pinero Zambrano, Ibraheem M. Al-Ageel, Aman Zeb, Mohamed Cherif Mazouz, Faisal H. AlGhamdi
Publikováno v:
All Days.
Khurais field has seen, on an average, a 35% increase in reservoir pressure during the past three years due to water injection for production maintenance. A workover campaign started two years ago to reenter and workover some of the power water injec