Zobrazeno 1 - 10
of 57
pro vyhledávání: '"Ian Firth"'
Publikováno v:
Stahlbau. 91:300-307
Publikováno v:
Footbridge 2022, Madrid: Creating Experience.
This paper describes the conception and realisation of an unusual 3-way footbridge. The unique plan form derived from the need to cross the Grand Union Canal at the point where the entrance to a new marina severed the existing tow path on one side. T
Autor:
David Nethercot, Ian Firth
Publikováno v:
Structural Engineering International. 33:367-367
Publikováno v:
IABSE Symposium, Prague 2022: Challenges for Existing and Oncoming Structures.
The Second Hinterrhein-Bridge is an award-winning new 200m long single-track railway bridge spanning over the river Rhine and the Highway A13 in a picturesque valley in the Swiss Alps. It has four spans and is located adjacent to a magnificent histor
Autor:
Ian Firth
Publikováno v:
Structural Engineering International. 31:168-170
The National Groups are the powerhouse of IABSE. If the National Groups are active and busy promoting and upholding the values and objectives of IABSE then the Association can thrive and grow. If t...
Autor:
Ian Firth
Publikováno v:
The Structural Engineer. 98:37-39
Ian Firth looks back at the box-girder bridge collapses of 1970 and considers the applicability of the lessons learned to structural engineers today.
Autor:
Ian Firth, Gary Rhyder
Publikováno v:
Principles of Occupational Health & Hygiene ISBN: 9781003116813
Principles of Occupational Health & Hygiene
Principles of Occupational Health & Hygiene
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::dbf4b60dd87d0361bbf47f1bcbc5435a
https://doi.org/10.4324/9781003116813-8
https://doi.org/10.4324/9781003116813-8
Autor:
Tim Chapman, Ian Firth
Publikováno v:
The Structural Engineer. 99:16-17
Tim Chapman and Ian Firth highlight the carbon differences between civil structures and buildings projects, and propose that engineers work with their clients to target low-carbon outcomes, rather than just low-carbon structures.
Publikováno v:
Proceedings. Mathematical, Physical, and Engineering Sciences
Long-span bridges have traditionally employed suspension or cable-stayed forms, comprising vertical pylons and networks of cables supporting a bridge deck. However, the optimality of such forms over very long spans appears never to have been rigorous
Publikováno v:
The Structural Engineer. 97:40-41
Four Past Presidents of the Institution – Professor John Nolan, Professor Nick Russell, Professor Ian Firth and Professor Tim Ibell – argue that attracting, enthusing, nurturing and launching the next generation of structural engineers should loo