Zobrazeno 1 - 10
of 20
pro vyhledávání: '"I. W. Sukerayasa"'
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 14, Iss 2, Pp 39-43 (2015)
In the years of 2014 until 2015 Pesangaran plant capacity undergo changes due to the expiration of employment contract lease diesel units and also the addition of new plant unit of 200 MW PLTMG. An increase or reduction in plant capacity of electrica
Externí odkaz:
https://doaj.org/article/39626b81212c4aa5bc644d91f119e32c
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 17, Iss 1, Pp 86-93 (2018)
Untuk memenuhi kebutuhan energi listrik di Pulau Bali yang semakin meningkat sekitar 6 – 9 % dalam 5 tahun mendatang, pemerintah telah mengupayakan pembangunan PLTU Celukan Bawang. Proyek PLTU Celukan Bawang yang dikerjakan sejak 2013 ini telah ber
Externí odkaz:
https://doaj.org/article/50f673707fde4439a7cc42c624237ef4
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 14, Iss 2, Pp 50-56 (2015)
Tibubeneng feeder equipped with protective devices over current relay (OCR) and ground fault relay (GFR) installed in Recloser Dama, Recloser Tandeg and relay feeder Tibubeneng in GI. Based on data from PLN Bali, there are 3 times the interference wi
Externí odkaz:
https://doaj.org/article/b1905a1d1f71440d8fe6beb327dce634
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 17, Iss 1, Pp 86-93 (2018)
Untuk memenuhi kebutuhan energi listrik di Pulau Bali yang semakin meningkat sekitar 6 – 9 % dalam 5 tahun mendatang, pemerintah telah mengupayakan pembangunan PLTU Celukan Bawang. Proyek PLTU Celukan Bawang yang dikerjakan sejak 2013 ini telah ber
Autor:
I N. Budiastra, I G. N. Janardana, C. G. I. Partha, I W. Sukerayasa, I.B.A. Swamardika, I W. A. Wijaya
Publikováno v:
Buletin Udayana Mengabdi, Vol 17, Iss 1, Pp 14-18 (2018)
design of electricity power installation, there are some items that have to be focused, one of them is thesecurity system design. In security system, accurate calculation is highly required to avoid dangers caused bythe usage of electricity power. On
Publikováno v:
Jurnal SPEKTRUM. 7:83
The need for electricity that is growing rapidly on the island of Bali, makes PT PLN (Persero)seek strategic steps in serving customers. Gilimanuk - Negara - Antosari Reconductoring SUTT150 kV is one of the efforts made by PT PLN (Persero) to improve
Publikováno v:
Jurnal SPEKTRUM. 7:169
Jatiluwih feeder is a primary 20 kV distribution network with a peak demand of 1.85 MW. The feeder has a radial configuration with a length of 120 kmc. The extended length of the feeder causes a high voltage drop and power loss. One strategy to reduc
Publikováno v:
Jurnal SPEKTRUM. 7:48
Wind power generation is a power plant that converts kinetic energy into electrical energy by utilizing wind as its energy source. The Smart Grid Pilot Project in Microgrid, Udayana University's Electrical Engineering Study Program has a wind power p
Publikováno v:
2018 International Conference on Smart Green Technology in Electrical and Information Systems (ICSGTEIS).
Smart Microgrid system on the roof top of classroom building at Udayana University has been installed for two years. It was a grant from The Ministry of Energy and Mineral Resources of Indonesia to Udayana University. The system consists of 10 unit w
Publikováno v:
Jurnal SPEKTRUM. 6:7
Saba feeder is a feeder who supplies 78 distribution transformers with feeder length 38,959 kms, through this Saba feeder electrical energy is channeled radially to each distribution substation. In 2017 the voltage shrinkage at Saba feeder was 9.88%