Zobrazeno 1 - 10
of 17
pro vyhledávání: '"I Wayan Suasira"'
Publikováno v:
Logic, Vol 20, Iss 2, Pp 80-84 (2020)
In terms of cost utilization, formwork is the largest cost component in concrete work on a building project. The cost for formwork is about 40-60% [6] of the cost of concrete work or about 10% of the total cost of building construction. With two meth
Externí odkaz:
https://doaj.org/article/9106971b87d64f2db87ab3a67a308f22
Publikováno v:
Matrix: Jurnal Manajemen Teknologi dan Informatika, Vol 18, Iss 3, Pp 98-102 (2018)
The implementation of the project from year to year is significantly improved on implementation aspects of cost, quality, and time, in order to manage the use of human resources to be realistic. Occupational health and safety in a company is often ig
Externí odkaz:
https://doaj.org/article/84479038912a431ba792234de5005d59
Publikováno v:
Matrix: Jurnal Manajemen Teknologi dan Informatika, Vol 18, Iss 2, Pp 64-71 (2018)
The complexity of the project expands along with the progress of human civilization. The problems that appear will be more numerous and complicated. The role of project management is indispensable in order to address and prevent these problems, so th
Externí odkaz:
https://doaj.org/article/3126d928f92c45498128be1d6ee2229b
Publikováno v:
Matrix: Jurnal Manajemen Teknologi dan Informatika, Vol 6, Iss 2 (2016)
Metode yang digunakan dalam analisis ini adalah metode pembebanan garis leleh dan metode pembebanan element shell. Tujuan dari analisis ini adalah : (1). Untuk mengetahui jumlah tulangan struktur yang dihasilkan dari kedua metode tersebut, (2). Menge
Externí odkaz:
https://doaj.org/article/b96c77d58d75473784064683bef3f5e6
Autor:
I Wayan Suasira, I Made Anom Santiana, I Gede Sastra Wibawa, I Made Tapa Yasa, Ni Putu Ary Yuliadewi
Publikováno v:
International research journal of engineering, IT & scientific research. 9:76-81
The implementation of government procurement of goods/services in the Gianyar Regency is carried out electronically by E-Tendering. In practice, the participation and bid value of bidders tends to decrease both during conventional auctions and electr
Autor:
I Made Anom Santiana, I Gede Sastra Wibawa, I Made Tapa Yasa, I Wayan Suasira, I Ketut Sutapa
Publikováno v:
International research journal of engineering, IT & scientific research. 8:299-305
Every construction project is always faced with the possibility of problems in the project. In reality, the implementation of construction projects always experiences obstacles that result in delays in the completion of work, so that the completion t
Publikováno v:
International research journal of engineering, IT & scientific research. 8:96-104
Denpasar represent town with amount of most resident in Bali and have tendency will increasingly. This of course will be followed by accelerating development various sector. This condition will be create various of urban problems, among the others pr
Autor:
I Wayan Suasira, I Wayan Intara, I Ketut Sutapa, I Made Anom Santiana, I Gede Sastra Wibawa, I Made Tapa Yasa
Publikováno v:
International research journal of engineering, IT & scientific research. 8:7-16
The purpose of this study is to determine the dimensions and reinforcement of structure, cost, and schedule due to the transition structure of the building function. The structural transition of building functions is carried out in the earthquake are
Autor:
I Ketut Sutapa, I Made Suardana Kader, I Made Anom Santiana, I Gede Sastra Wibawa, I Made Tapa Yasa, I Wayan Suasira
Publikováno v:
International journal of physical sciences and engineering. 5:52-60
Risk is the possibility of the occurrence of an event outside of which every activity that is likely to be detrimental is carried out by humans. In the Nangarasong Steel Frame construction project in Flores district, there is uncertainty which will c
Publikováno v:
Proceedings Series on Physical & Formal Sciences. 1:199-204
The construction projects are always faced with the possibility of risk problems. The rapid development in the Denpasar area is in line with the many construction projects, especially buildings such as hotel construction, construction of new school b