Majalah Ilmiah Teknologi Elektro, Vol 17, Iss 1, Pp 86-93 (2018)
Untuk memenuhi kebutuhan energi listrik di Pulau Bali yang semakin meningkat sekitar 6 – 9 % dalam 5 tahun mendatang, pemerintah telah mengupayakan pembangunan PLTU Celukan Bawang. Proyek PLTU Celukan Bawang yang dikerjakan sejak 2013 ini telah ber
Externí odkaz:
https://doaj.org/article/50f673707fde4439a7cc42c624237ef4
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 14, Iss 2, Pp 39-43 (2015)
In the years of 2014 until 2015 Pesangaran plant capacity undergo changes due to the expiration of employment contract lease diesel units and also the addition of new plant unit of 200 MW PLTMG. An increase or reduction in plant capacity of electrica
Externí odkaz:
https://doaj.org/article/39626b81212c4aa5bc644d91f119e32c
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 14, Iss 2, Pp 50-56 (2015)
Tibubeneng feeder equipped with protective devices over current relay (OCR) and ground fault relay (GFR) installed in Recloser Dama, Recloser Tandeg and relay feeder Tibubeneng in GI. Based on data from PLN Bali, there are 3 times the interference wi
Externí odkaz:
https://doaj.org/article/b1905a1d1f71440d8fe6beb327dce634
Publikováno v:
Buletin Udayana Mengabdi, Vol 15, Iss 1 (2016)
Muncak Sari Luhur Temple is one of several temples located in West part of Batu Karu Sad Kahyangan Temple. The temple is within Sangketan village, district of Penebel, Tabanan region. Recently, it has been carried out a renovation and an extension of
Externí odkaz:
https://doaj.org/article/30912e517cdf4856a61bd8ad14462e20
Publikováno v:
Buletin Udayana Mengabdi, Vol 11, Iss 1 (2012)
In order to fulfill the need of society energy, especially in the rural area, the building of an energy storage in every village is compulsory. The energy storage should be built by utilizing the local energy potency source, be processed and utilize
Externí odkaz:
https://doaj.org/article/74a16a2e4b314aadb98c0c180960870a
Publikováno v:
Majalah Ilmiah Teknologi Elektro, Vol 17, Iss 1, Pp 86-93 (2018)
Untuk memenuhi kebutuhan energi listrik di Pulau Bali yang semakin meningkat sekitar 6 – 9 % dalam 5 tahun mendatang, pemerintah telah mengupayakan pembangunan PLTU Celukan Bawang. Proyek PLTU Celukan Bawang yang dikerjakan sejak 2013 ini telah ber
Autor:
I N. Budiastra, I G. N. Janardana, C. G. I. Partha, I W. Sukerayasa, I.B.A. Swamardika, I W. A. Wijaya
Publikováno v:
Buletin Udayana Mengabdi, Vol 17, Iss 1, Pp 14-18 (2018)
design of electricity power installation, there are some items that have to be focused, one of them is thesecurity system design. In security system, accurate calculation is highly required to avoid dangers caused bythe usage of electricity power. On
Publikováno v:
Jurnal SPEKTRUM. 7:83
The need for electricity that is growing rapidly on the island of Bali, makes PT PLN (Persero)seek strategic steps in serving customers. Gilimanuk - Negara - Antosari Reconductoring SUTT150 kV is one of the efforts made by PT PLN (Persero) to improve
Publikováno v:
Jurnal SPEKTRUM. 7:169
Jatiluwih feeder is a primary 20 kV distribution network with a peak demand of 1.85 MW. The feeder has a radial configuration with a length of 120 kmc. The extended length of the feeder causes a high voltage drop and power loss. One strategy to reduc
Publikováno v:
Jurnal SPEKTRUM. 7:48
Wind power generation is a power plant that converts kinetic energy into electrical energy by utilizing wind as its energy source. The Smart Grid Pilot Project in Microgrid, Udayana University's Electrical Engineering Study Program has a wind power p