Jurnal Ilmiah SINERGI, Vol 28, Iss 3, Pp 535-544 (2024)
Earthquakes are a serious threat in the construction of multi-storey buildings in Indonesia, which are divided into several seismic design categories. The design of seismic-resistant buildings requires the management of plastic hinges to reduce seism
Externí odkaz:
https://doaj.org/article/5cb2c9c6c28c42ae87d17b758c4f7f36
Publikováno v:
Logic, Vol 23, Iss 2, Pp 96-103 (2023)
A problem that often occurs in construction projects is the delay in the implementation process. Various factors cause the delay, but in developing countries such as Indonesia, the dominant delay occurs because the implementing contractor causes it f
Externí odkaz:
https://doaj.org/article/766e3eb8fcb64bb785860a6fcb8f2224
Publikováno v:
Logic, Vol 21, Iss 1, Pp 31-39 (2021)
In the construction planning process, the calculation of the quantity of each project work was packaged in a Bill of Quantity (BoQ) to complete the project and greatly affected the continuity of the entire construction construction process. With adva
Externí odkaz:
https://doaj.org/article/54cb1b906a244b9cbbe27563c5a93339
Publikováno v:
Civil Engineering Journal, Vol 30, Iss 1 (2021)
This experiment's objective is to prove that the reinforcing rib's form contributes to its bond strength. The specimen is the concrete cubes measuring 150 × 150 × 150 mm; bar installed in the center of the concrete cube. Bars use 13, 16, and 19 mm
Externí odkaz:
https://doaj.org/article/375ae2cf5a5b4c758b2b53fde2eec724
Autor:
Nedya Sonelma, I Ketut Sucita
Publikováno v:
Construction and Material Journal. 4:71-81
One of the factors in achieving project success is influenced by the role of a project manager. Project managers (PM) as project leaders are required to have and fulfill the competencies needed to ensure the realization of project management, so that
Publikováno v:
KERN : Jurnal Ilmiah Teknik Sipil. 8:29-36
Pekerjaan keramik adalah salah satu pekerjaan finishing dalam proyek konstruksi. Dalam masa pandemi Covid-19, proyek konstruksi di Indonesia mengalami dampak berupa perlambatan pekerjaan bahkan hingga penghentian sementara pekerjaan termasuk pekerjaa
Publikováno v:
Construction and Material Journal. 3:197-205
The high complexity, the large workload, and the quite limited implementation time make apartment projects bound for uncertainty that poses various risks. Risk is a combination of the probability of an event and the consequences of the event, where t
Publikováno v:
Jurnal Ilmiah Rekayasa Sipil. 18:100-112
The most important thing in the construction of toll roads, especially elevated toll roads, is the erection girder. The implementation of this erection girder certainly requires a long time and a large cost, so it requires the right work method in it
Autor:
Narisa Adistianti, I Ketut Sucita
Publikováno v:
Construction and Material Journal. 2:91-98
Along with the Jakarta Governor rules no. 38/2012 about green building, The Contractors in the capital has been practicing to implement green construction in building construction. This is done by a contractor state-owned or private contractor. The p
Publikováno v:
Jurnal Poli-Teknologi. 19:63-70
The problem in the The Conexio Cikunir 1 Apartment project which has the concept of Transit Oriented Development (TOD) was had delayed, which should have been 100% contractually completed, but only 46.231% have been realized. Based on these percentag