Zobrazeno 1 - 10
of 21
pro vyhledávání: '"Hyoung-Ho Doh"'
Publikováno v:
Defence Science Journal; Nov2023, Vol. 73 Issue 6, p666-674, 9p
Autor:
Dong-Ho Lee, Hyoung Ho Doh
Publikováno v:
Engineering Optimization. 54:1476-1493
This study addresses a dynamic lot-sizing problem for remanufacturing systems in which end-of-use/life products are disassembled into their parts on a single disassembly workstation and then each p...
Publikováno v:
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture. 235:650-662
This study addresses a part selection problem for flexible manufacturing systems in which part processing times are controllable to optimize the total cost associated with energy consumption, operational performance, and so on. The problem is to dete
Publikováno v:
International Journal of Production Research. 58:863-877
This study addresses an integrated batching and scheduling problem for a single-machine flexible machining cell in which each pallet can load multiple parts, i.e. multi-fixturing pallets, and part ...
Publikováno v:
Industrial Engineering & Management Systems. 17:1-13
Publikováno v:
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture. 232:867-878
Disassembly levelling is to determine disassembly structures that specify components to be obtained from end-of-use/life products, and disassembly lot-sizing is to determine the timing and quantity of disassembling end-of-use/life products to satisfy
Publikováno v:
Industrial Engineering and Management Systems. 15:11-18
This paper considers a scheduling problem in a flexible job shop with a reconfigurable manufacturing cell. The flexible job shop has both operation and routing flexibilities, which can be represented in the form of a multiple process plan, i.e. each
Publikováno v:
IFIP Advances in Information and Communication Technology ISBN: 9783319997032
APMS (1)
APMS (1)
This study addresses a multi-period part selection problem for flexible manufacturing systems in which processing times are controllable. The problem is to determine the set of parts and their processing times while satisfying the processing time and
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::1a349015fe201be562f3545d7f15bda5
https://doi.org/10.1007/978-3-319-99704-9_54
https://doi.org/10.1007/978-3-319-99704-9_54
Decision Tree based Scheduling for Static and Dynamic Flexible Job Shops with Multiple Process Plans
Autor:
Sung-Ho Nam, Hyung-Won Kim, Jeonghoon Shin, Jae-Min Yu, Dong-Ho Lee, Hyoung-Ho Doh, Yong-Ju Kwon
Publikováno v:
Journal of the Korean Society for Precision Engineering. 32:25-37
This paper suggests a decision tree based approach for flexible job shop scheduling with multiple process plans. The problem is to determine the operation/machine pairs and the sequence of the jobs assigned to each machine. Two decision tree based sc
Publikováno v:
Proceedings of the Institution of Mechanical Engineers, Part B: Journal of Engineering Manufacture. 229:1645-1653
This study proposes an integrated model for capacity and production planning in a hybrid production system with manufacturing and remanufacturing facilities. The manufacturing facility produces new products from raw materials, while the remanufacturi