Zobrazeno 1 - 10
of 15
pro vyhledávání: '"Huu Dang Quoc"'
Autor:
Huu Dang Quoc
Publikováno v:
Mathematical Biosciences and Engineering, Vol 20, Iss 8, Pp 15407-15430 (2023)
The Multi-Skill Resource-Constrained Project Scheduling Problem (MS-RCPSP) is an NP-Hard problem that involves scheduling activities while accounting for resource and technical constraints. This paper aims to present a novel hybrid algorithm called M
Externí odkaz:
https://doaj.org/article/8be7eadba68e42978b9be6d0d69290da
Publikováno v:
Applied Computational Intelligence and Soft Computing, Vol 2022 (2022)
The paper proposed a new algorithm to solve the Multiskill Resource-Constrained Project Scheduling Problem (MS-RCPSP), a combinational optimization problem proved in NP-Hard classification, so it cannot get an optimal solution in polynomial time. The
Externí odkaz:
https://doaj.org/article/4be419abf1d3406b8885b76cc2f96641
Publikováno v:
Journal of Advanced Transportation, Vol 2020 (2020)
This paper defines and introduces the formulation of the Real-RCPSP (Real-Resource-Constrained Project Scheduling Problem), a new variant of the MS-RCPSP (Multiskill Resource-Constrained Project Scheduling Problem). Real-RCPSP is an optimization prob
Externí odkaz:
https://doaj.org/article/fe3a2a04d8b942919e22d1001558421e
Publikováno v:
Journal of Science Natural Science. 68:77-90
This paper proposes and states a novel problem called TDOS-RCPSP, a general case of the classical RCPSP problem. TDOS-RCPSP problem has many applications in science, especially in industrial production lines such as car assembly and textiles. In this
Autor:
Ha Le Viet, Huu Dang Quoc
Publikováno v:
Electronics; Volume 12; Issue 8; Pages: 1825
In the context of the industrial revolution 4.0 that is firmly taking place globally, the digital transformation process is considered a revolution that changes the operating and business model. In Vietnam, logistics is one of eight areas that need t
Publikováno v:
Journal of Science Natural Science. 65:98-109
The purpose of this paper is to consider the project scheduling problem under such limited constraint, called Multi-Skill Resource-Constrained Project Scheduling Problem or MS-RCPSP. The algorithm proposed in this paper is to find the optimal schedul
Publikováno v:
RIVF
The aim of this paper is to suggest novel Cuckoo Search algorithm to solving Multi-Skill Resource Constrained Project Scheduling Problem (MS -RCPSP). Our proposed evolutionary algorithm, which called CSM, inspired by Cuckoo Search algorithm. CSM fast
Publikováno v:
2020 2nd International Conference on Computer Communication and the Internet (ICCCI).
The Resource-Constrained Project Scheduling Problem (RCPSP) is a classical combinational optimization problem that has many practical applications. In this paper, we consider an extension of the RCPSP which called Multi-Skill Resource-Constrained Pro
Publikováno v:
Scientific Programming, Vol 2020 (2020)
Scheduling is a fundamental factor in managing the network resource of the Internet of things. For IoT systems such as production lines, to operate effectively, it is necessary to find an intelligent management scheme, i.e., schedule, for network res
Publikováno v:
2019 6th NAFOSTED Conference on Information and Computer Science (NICS).
In this paper, an optimization approach in solving Multi-Skill Resource Constrained Project Scheduling Problem (MS-RCPSP) has been presented. We proposed an evolutionary algorithm, which called CSM, based on Cuckoo Search algorithm. Proposed algorith