Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Hussan Al-Chalabi"'
Publikováno v:
Data, Vol 3, Iss 2, p 12 (2018)
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of u
Externí odkaz:
https://doaj.org/article/7fb1e64d2a3c461e995207eed7858599
Publikováno v:
International Journal of Computer Integrated Manufacturing. 33:1076-1088
The aim of this study has been to develop a two-level multi-objective genetic algorithm (MOGA) to optimize risk-based LCC analysis to find the optimal maintenance replacement time for road tunnel v...
Autor:
Hussan AL-Chalabi
In mining operation equipment replacement represents a strategic decision problem. This paper presents an economic replacement time model for mining drill rigs. A total ownership cost minimization model was developed to optimize the lifetime of a dri
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::b73abd2539e9e13845f65996ab2093bb
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-90146
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-90146
Autor:
Hussan Al-Chalabi
Purpose The purpose of this paper is to develop a practical economic replacement decision model to identify the economic lifetime of the ventilation system used by Trafikverket in its Stockholm tunnels. Design/methodology/approach The proposed data-d
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::871864dfc70fedc77dd693daac0c4b8b
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-64975
http://urn.kb.se/resolve?urn=urn:nbn:se:ltu:diva-64975
Publikováno v:
Journal of Quality in Maintenance Engineering. 21:207-226
Purpose – The purpose of this paper is to present a practical model to determine the economic replacement time (ERT) of production machines. The objective is to minimise the total cost of capital equipment, where total cost includes acquisition, op
Publikováno v:
Journal of Quality in Maintenance Engineering. 20:306-332
Purpose – The purpose of this paper is to analyse and compare the downtime of four drilling machines used in two underground mines in Sweden. The downtime of these machines was compared to show what problems affect downtime and which strategies sho
Publikováno v:
Application of Materials Science and Environmental Materials (AMSEM2015).
Publikováno v:
Data; Volume 3; Issue 2; Pages: 12
Data, Vol 3, Iss 2, p 12 (2018)
Data, Vol 3, Iss 2, p 12 (2018)
Collecting the failure data and reliability analysis in an underground mining operation is challenging due to the harsh environment and high level of production pressure. Therefore, achieving an accurate, fast, and applicable analysis in a fleet of u
Publikováno v:
Lecture Notes in Mechanical Engineering ISBN: 9783319235967
Drilling rigs are widely used in mine development or construction and tunnel engineering projects. The rig consists of 12 subsystems in a series configuration and can be driven by diesel or electrical engines. This paper uses the Kamat-Riley (K-R) ev
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::91a23bf92838d2490af59e4a2d920b2b
https://doi.org/10.1007/978-3-319-23597-4_46
https://doi.org/10.1007/978-3-319-23597-4_46