Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Hui Zhi Yi"'
Publikováno v:
Journal of Applied Geophysics. 159:294-303
Hydraulic fracturing plays a crucial role for economic production from unconventional resources. Especially development of shale gas resources is highly dependent on this evolving technology. Meanwhile, advanced logging tools, microseismic mapping an
Publikováno v:
Journal of the Operational Research Society. 66:2050-2060
For high-value added products, machining tools’ lifespan significantly influences the quantity of procurement in machining process. Preemption of tools from the workpiece while processing is continuing is sometime beneficial to safeguard the produc
Publikováno v:
International Journal of Production Economics. 157:250-260
Emergency supply chain management is often in the focal point of public scrutiny. Expected cost minimization may result in unacceptable high shortage for scenarios with small probabilities that is hardly tolerated by the public. To decrease the loss
Publikováno v:
International Journal of Production Economics. 156:332-345
This research deals with a production-inventory problem consisting of three-stage tree-type single-producer multi-distributor and multi-retailer supply chain network where a model has been developed for achieving the lowest total cost for operating a
Publikováno v:
Applied Mechanics and Materials. 627:314-317
This research studies the impact of maximum allowable stopping time for machining tools on the production-inventory policy under a variable tools lifespan and demand. A mathematical model is developed to determine the optimal maximal allowing stoppin
Publikováno v:
International Journal of Production Research. 52:6175-6191
Traditional procurement policy was deeply investigated for many kinds of demand in different industrial sectors. More extensive explorations on procurement including the combination with manufacturing process and detailed attributes of the purchased
Autor:
Hui Zhi Yi, Bhaba R. Sarker
Publikováno v:
International Journal of Production Research. 52:4853-4875
This paper studies a vendor–buyer integrated inventory system with buyers’ variable demand and warehouse space limitation where the consignment stock (CS) replenishment operates under a controllable lead time. Within any cycle, the production rat
Autor:
Bhaba R. Sarker, Hui Zhi Yi
Publikováno v:
International Journal of Production Research. 51:6316-6335
This paper considers a single-vendor and single-buyer production system in which the lead-time is controllable with an extra investment under a long-term agreement between the two trading partners. The vendor produces at a finite rate, ships the outp
Autor:
Hui Zhi Yi, Bhaba R. Sarker
Publikováno v:
Computers & Operations Research. 40:2632-2645
This paper aims to enable the decision maker of an integrated vendor-buyer system, under Consignment Stock (CS) policy, to make the optimal/sub-optimal production/replenishment decisions where the buyer places a space limitation to the vendor and the
Publikováno v:
Applied Soft Computing. 13:2433-2444
This paper presents three hybrid metaheuristic algorithms that further improve the two hybrid differential evolution (DE) metaheuristic algorithms described in Liao [1]. The three improved algorithms are: (i) MDE'-HJ, which is a modification of MA-MD