Zobrazeno 1 - 10
of 44
pro vyhledávání: '"Hossein Mostafaei"'
Autor:
Jochen Carl, Hossein Mostafaei
Publikováno v:
Structures Congress 2023.
Publikováno v:
Pneumon. 35:1-9
Publikováno v:
European Journal of Operational Research. 293:731-747
Multiproduct pipeline transportation scheduling is a complex operations research problem that is characterized by the movement of the cargo rather than the carrier. Hence, it cannot be solved using vehicle routing methods. While most formulations for
Publikováno v:
Industrial & Engineering Chemistry Research. 59:16684-16694
Data science has become an important research topic across scientific disciplines. In Process Systems Engineering, one attempt to create true value from process data is to use it proactively to improve the quality and accuracy of production planning
Autor:
Pedro M. Castro, Hossein Mostafaei
Publikováno v:
Computers & Chemical Engineering. 122:2-18
This paper presents a new mixed-integer linear programming (MILP) formulation for the short-term scheduling of liquid transportation by pipeline. It relies on a continuous-time representation featuring a single grid and is suitable for treelike syste
Autor:
Iiro Harjunkoski, Hossein Mostafaei
Publikováno v:
IFAC-PapersOnLine. 52:832-837
Short term scheduling of multipurpose batch processes has received growing attention over past decades. It concerns the optimal allocation of a set of limited resources to tasks over time in order to enhance the revenue of plants. This paper addresse
Autor:
Hossein Mostafaei, Fabricio Oliveira
Publikováno v:
31st European Symposium on Computer Aided Process Engineering ISBN: 9780323885065
A plethora of contributions have appeared in the literature over the past decade in the area of production planning of a single machine with sequence-dependent changeovers. Most of them, however, deal with the deterministic optimization model where a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::783ab9a99faffc8e7622ab7b7cf256ba
https://doi.org/10.1016/b978-0-323-88506-5.50269-2
https://doi.org/10.1016/b978-0-323-88506-5.50269-2
Autor:
Yixin Ye, Iiro Harjunkoski, Ignacio E. Grossmann, David E. Bernal, Hossein Mostafaei, Teemu J. Ikonen
Engineering systems are typically maintained during planned, or unplanned, downtimes in between operation periods. If the duration of the downtime or the budget of the maintenance is an active constraint, all desired maintenance actions cannot be con
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::315981360536f8e331c9b53ea962a034
https://aaltodoc.aalto.fi/handle/123456789/45590
https://aaltodoc.aalto.fi/handle/123456789/45590