Zobrazeno 1 - 4
of 4
pro vyhledávání: '"Hossam Mesbah"'
Publikováno v:
Day 2 Wed, September 22, 2021.
Objective/Scope Integrity of the wells and facilities is planned right from the reservoir development phase. In the pilot phase all the contributing parameters are collected and considered in the design of the production facilities. As the corrosion/
Publikováno v:
Day 1 Tue, March 26, 2019.
This paper discusses the application of IIoT in various areas of oil and gas upstream. It elaborates on the drivers of IIoT, presents the advantages and benefits and describes the challenges faced as of today in the implementation. IIoT and cloud com
Publikováno v:
Day 1 Wed, November 28, 2018.
The main objective for the implementation of this methodology was to achieve uninterrupted production and avoid failures. Heavy oil wells undergoing CSS in the field in Kuwait, pose challenges of high temperature and sand incursion. As soon as the we
Publikováno v:
All Days.
Producing heavy oil from shallow wells using rod pump applications requires careful design considerations especially for down hole components to achieve maximum production rate and maximize the run life. This paper highlights a successful case study