Zobrazeno 1 - 5
of 5
pro vyhledávání: '"Hermogenes Duno"'
Autor:
Willie Colombine Dakduk, Leiro David Medina, Jose Ramon Palacios, Ocdomar Casanova, Hermogenes Duno, Corrado Pier Maria Lupo, Hermogenes Duno Moreno
Publikováno v:
All Days.
The development field Tizon, is located west of Frontera, NE of the Palapa and Luna Fields, Municipality of Centla, in the Coastal Plain of the Southern Gulf of Mexico in Tabasco State. Historic crude oil exploitation targets the Cretaceous and Juras
Autor:
Carlos Andres Bonilla, Juan Carlos Beltran Paredes, Hermogenes Duno Moreno, Marcos Adrian Chable, Corrado Pier Lupo Cecconi
Publikováno v:
All Days.
The first commercial discovery of oil in Mexico took place in 1904, with the Pez-1 well located in the area of Ébano, San Luis Potosí. This well produced 1,500 barrels per day of crude oil. At the time, any well producing one tenth of this producti
Autor:
Erwin Duvan Gomez, Jose Casaos, Juan Carlos Beltran, Corrado Pier Maria Lupo, Marcos Chavarria, Hermogenes Duno
Publikováno v:
All Days.
Proper planning and front-end engineering, in a Biphasic MPD operation to drill a high temperature depleted reservoir in Mexico south area, demonstrated the real added value of the Constant Bottom Hole Pressure (CBHP) technique to overcome risks asso
Autor:
Hermogenes Duno, Juan Carlos Beltran, Corrado Pier Maria Lupo, Jose Fernando Gallo Zapata, Leiro David Medina
Publikováno v:
All Days.
The oilfields in study are important assets for the National Oil Company and represent 14% of the total oil production of the country. Two wide different and drastically challenging scenarios can be found: HPHT wells with a narrow mud weight window;
Autor:
Hermogenes Duno, Hernan Melgares Escalera, Gustavo Puerto Puerto, Efrain Jose Rodriguez, Jorge Ivan Bedoya, Jose Tang, Juan Carlos Beltran Paredes, Jose Fernando Gallo Zapata, Jimmy Efrain Rojas Navarro, Corrado Pier Maria Lupo, Leiro David Medina
Publikováno v:
All Days.
Hydraulic modeling is a fundamental piece of any Managed Pressure Drilling operation using multiphase gasified drilling fluids. MPD Engineers rely on hydraulic flow modeling systems to predict equivalent circulating densities. Models also allow desig