Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Helge Fjeldberg"'
Publikováno v:
All Days.
The paper describes the successful use of an advanced comprehensive managed pressure setup to run and cement a liner that covered reservoir layers with pressures ranging from no depletion to 130 bar depletion in the Kvitebjorn field in the North Sea.
Autor:
Knut Steinar Bjorkevoll, Ole Iacob Prebensen, Eric Low, Tore Larsen, Helge Fjeldberg, Steinar Torvund, John Walton McCaskill, Svein Syltoy, Per Cato Berg, Svein Erik Eide
Publikováno v:
All Days.
Drilling wells in high-pressure, high-temperature (HPHT) reservoirs is often characterized by a narrow operating window between formation pore pressure and fracture pressure. Depletion further reduces this window. Managed Pressure Drilling (MPD) prov
Publikováno v:
SPE Russian Oil and Gas Technical Conference and Exhibition.