Publikováno v:
Journal of Engineering Research - Egypt, Vol 6, Iss 5, Pp 64-74 (2022)
Duration, cost, and resources are defined as constraints in projects. Consequently, Construction manager needs to balance between theses constraints to ensure that project objectives are met. Choosing the best alternative of each activity is one of t
Externí odkaz:
https://doaj.org/article/1c09f5414f104188baf350290325c0e5
Publikováno v:
Journal of Engineering Research - Egypt, Vol 5, Iss 4, Pp 77-82 (2022)
Safety and productivity in construction industry of Egypt still suffers from ignorance. This low consideration of safety importance caused escalation of accident rate in construction projects. The paperaims to identify the safety factors most related
Externí odkaz:
https://doaj.org/article/b654e8b405394ecbab5da7929e45cd8c
Publikováno v:
Journal of Engineering Research - Egypt, Vol 4, Iss December, Pp 7-19 (2020)
Project scheduling provides a good insight for the manager to complete the project on time. Project scheduling gives complete timing analysis of activities involved and identifies the critical ones. Critical Path Method (CPM) is the most widely used
Externí odkaz:
https://doaj.org/article/8df048cae56e4baba20614d1a5bb8111
Publikováno v:
Journal of Engineering Research - Egypt, Vol 3, Iss June, Pp 66-75 (2019)
Successful construction projects should meet the planning and design objectives within budget and time constraints. Planning and scheduling for the construction projects and their resources are essential tasks for overall project success. Cash, in pa
Externí odkaz:
https://doaj.org/article/7638791f90ec44c9bec1b2dd46f5e601
Publikováno v:
Journal of Engineering Research - Egypt, Vol 2, Iss December, Pp 1-6 (2018)
The difficulty of selection of contractors in Egypt as a result of multiple and different criteria to select contractors and the different relative weights from one project to another has always been the main factors of the problem. There is a need t
Externí odkaz:
https://doaj.org/article/03d2a09c123947edb2bb0630be922b15
Publikováno v:
Engineering, Construction and Architectural Management, 2016, Vol. 23, Issue 3, pp. 265-282.
Externí odkaz:
http://www.emeraldinsight.com/doi/10.1108/ECAM-11-2014-0135
Publikováno v:
Journal of Engineering Research.