Zobrazeno 1 - 10
of 14
pro vyhledávání: '"Harrison Mesa"'
Publikováno v:
Ain Shams Engineering Journal, Vol 14, Iss 9, Pp 102089- (2023)
The traditional design approach faces difficulties in adequately responding to the value expected by customers. This research explores the generation and loss of value in the traditional housing design to understand how it responds to customer needs
Externí odkaz:
https://doaj.org/article/2c8c034cb8704a348e79a64561412a41
Publikováno v:
Buildings, Vol 12, Iss 7, p 922 (2022)
Target value design (TVD) is a management approach that applies target costing in the design and construction industry. TVD enables a project environment with favorable characteristics to generate value. However, because the TVD’s primary assessmen
Externí odkaz:
https://doaj.org/article/773190329c754466ab6e7b4c5c1a21d7
Publikováno v:
Lecture Notes in Civil Engineering ISBN: 9783031308789
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::0d808e1b34779e4569e23d1a5145b3e7
https://doi.org/10.1007/978-3-031-30879-6_22
https://doi.org/10.1007/978-3-031-30879-6_22
Publikováno v:
Journal of management in engineering, 38(3):05022002. American Society of Civil Engineers
Public-Private Partnership (PPP) programs have been developed widely for more than 30 years across the world. The continuity of these programs depends on an adequate balance of three-dimensional sustainability (i.e., economic, environmental, and soci
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::81790a0b7bc694e0e17bd156ee6a44a9
https://hdl.handle.net/11583/2977041
https://hdl.handle.net/11583/2977041
Publikováno v:
International Journal of Project Management. 37:395-409
Integrated Project Delivery (IPD) and Lean Project Delivery (LPD) are innovative approaches that are capturing the attention of the construction industry. However, there is a confusion about the definitions of these approaches and how they integrate
Publikováno v:
Sustainability, Vol 12, Iss 4224, p 4224 (2020)
Sustainability
Volume 12
Issue 10
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
instname
Sustainability
Volume 12
Issue 10
RiuNet. Repositorio Institucional de la Universitat Politécnica de Valéncia
instname
[EN] The architecture, engineering, and construction industry requires methods that link the capture of customer requirements with the continuous measurement of the value generated and the identification of value losses in the design process. A value
Publikováno v:
Proc. 27th Annual Conference of the International Group for Lean Construction (IGLC).
Publikováno v:
International Journal of Project Management. 34:1089-1101
Many building projects do not meet owners' performance expectations. Integrated project delivery (IPD) has emerged as a new delivery system with the potential to provide better performance through more supply chain integration. However, there is a kn
Publikováno v:
Sustainability
Volume 12
Issue 11
Sustainability, Vol 12, Iss 4478, p 4478 (2020)
Volume 12
Issue 11
Sustainability, Vol 12, Iss 4478, p 4478 (2020)
Risk allocation plays a crucial role in the successful development of public-private partnership (PPP) projects. However, despite being an important topic for scholars and practitioners, the existing literature does not provide sufficient evidence on
Publikováno v:
Revista de Ingeniería de Construcción, Vol 23, Iss 2, Pp 64-71 (2008)
Se están desarrollando actividades de simulación digital de procesos encaminadas a modelar la construcción de la estructura de muros y losas en concreto en proyectos inmobiliarios de una firma constructora colombiana. En un primer proyecto se gene