Publikováno v:
Architecture and Engineering, Vol 6, Iss 4, Pp 34-41 (2021)
Introduction: Planning integrated development of a residential area involves determining the composition of the objects to be built and creating an appropriate integration mechanism, backed up by a generalized work schedule. The existing methods of f
Externí odkaz:
https://doaj.org/article/ea3acd8ff6a84f28a8a22e755e3d4f2c
Publikováno v:
Вестник гражданских инженеров. 17:127-133
Construction scheduling is based on data on the duration of works, which are directly related to the values of labor costs. This ensures obtaining of the most accurate results of scheduling implemented both at the stage of construction design and in
Publikováno v:
IOP Conference Series: Materials Science and Engineering. 869:062003
In the scheduling of construction production, which is an integral function of the organization of construction, the task often arises of choosing adequate labor costs. There is an obvious way to solve this problem - this is the use of previously dev