Zobrazeno 1 - 10
of 18
pro vyhledávání: '"Haim Schlick"'
Autor:
Haim Schlick
Publikováno v:
Journal of Performance of Constructed Facilities. 5:288-289
Autor:
Haim Schlick
Publikováno v:
Journal of Construction Engineering and Management. 112:62-68
One of the crucial problems that faces designers, construction managers, general contractors, and subcontractors is creating the most appealing facade of a building at the most cost-effective price, while satisfying an owner’s goal of exploiting th
Autor:
Haim Schlick
Publikováno v:
Journal of Construction Engineering and Management. 110:295-307
Autor:
Haim Schlick
Publikováno v:
Journal of Construction Engineering and Management. 109:447-459
It appears that in construction projects extending through winter with freezing temperatures, the cost of temporary heating is not always equitably resolved between the parties in a contract. Although existing guidelines have been initiated since 196
Autor:
Haim Schlick
Publikováno v:
Journal of the Construction Division. 107:361-372
A computerized system to administer and control construction projects is developed as a financial management tool for unit price contracts in an inflationary market. It is applied effectively form issuance of preliminary drawings up to completion of
Autor:
Haim Schlick
Publikováno v:
Journal of the Construction Division. 107:559-574
The use of network analysis for preplanning and scheduling of a crash construction project was decisive in completing it on time. The use of small crew sizes proved to be the most efficient way to operate. Retrospective analysis used on this project
Autor:
Haim Schlick
Publikováno v:
Journal of the Construction Division. 107:158-159
Autor:
Haim Schlick
Publikováno v:
Journal of Construction Engineering and Management. 113:351-352
Autor:
Haim Schlick
Publikováno v:
Journal of the Construction Division. 107:766-767
Autor:
Haim Schlick
Publikováno v:
Journal of the Construction Division. 107:412-412