Zobrazeno 1 - 10
of 122
pro vyhledávání: '"H. Roscoe"'
Autor:
W. R. Simpson, R. von Glasow, K. Riedel, P. Anderson, P. Ariya, J. Bottenheim, J. Burrows, L. J. Carpenter, U. Frieß, M. E. Goodsite, D. Heard, M. Hutterli, H.-W. Jacobi, L. Kaleschke, B. Neff, J. Plane, U. Platt, A. Richter, H. Roscoe, R. Sander, P. Shepson, J. Sodeau, A. Steffen, T. Wagner, E. Wolff
Publikováno v:
Atmospheric Chemistry and Physics, Vol 7, Iss 16, Pp 4375-4418 (2007)
During springtime in the polar regions, unique photochemistry converts inert halide salt ions (e.g. Br−) into reactive halogen species (e.g. Br atoms and BrO) that deplete ozone in the boundary layer to near zero levels. Since their discovery in th
Externí odkaz:
https://doaj.org/article/cade3631f75544eca5f758f866b33982
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 163:279-290
Embedded retaining walls for 1·8 km of cut-and-cover tunnels and earth-retaining structures were redesigned during the construction period to optimise construction methods and temporary propping. The design approach included many of the developments
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 160:227-236
To facilitate construction of the Channel Tunnel Rail Link through Ashford in cut-and-cover tunnels and retained cut, it was necessary to control pore water pressures in the relatively low-permeability, laminated Weald Clay. This was achieved by mean
Publikováno v:
Scopus-Elsevier
The design and construction of a contiguous bored pile propped retained cut on the approaches to Ashford International Station raised some challenging design issues. Design problems associated with under-drainage and groundwater control (including th
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 158:187-196
Over 700 instruments were installed to monitor the performance of the cut and cover tunnels that carry the Channel Tunnel Rail Link through Ashford. Careful monitoring confirmed design assumptions and provided a sound basis for changes to the constru
Publikováno v:
Proceedings of the Institution of Civil Engineers - Geotechnical Engineering. 165:391-393
Most would accept CIRIA C580 (Gaba et al., 2003) as a guide to previous good practice. The author’s conclusion that designs to Eurocode 7 give lower margins of safety than are recommended in CIRIA C580 is indeed surprising, and as he states is cont
Autor:
M H, ROSCOE
Publikováno v:
The Quarterly journal of medicine. 19(75)
Autor:
M H, ROSCOE, H S, McKAY
Publikováno v:
Edinburgh Medical Journal