Zobrazeno 1 - 5
of 5
pro vyhledávání: '"H. Mohammadi Andargoli"'
Autor:
N. Shahsavari pour, M.H. Abolhasani Ashkezari, H. Sheikhi, H. Mohammadi Andargoli, H. Abolhasani Ashkezari
Publikováno v:
International Journal of Research in Industrial Engineering, Vol 3, Iss 4, Pp 1-12 (2014)
Various procedures, methods, constraints and objectives are studied in a flow shop problem during the past decades. In order to adapt the problem to the reality form, its parameters are considered as a fuzzy model. In this problem, we consider the pr
Externí odkaz:
https://doaj.org/article/fbb88f052852493a98f971747f3c4f17
Publikováno v:
International Journal of Research in Industrial Engineering, Vol 2, Iss 1, Pp 20-29 (2013)
Considering flow shop scheduling problem with more objectives, will help to make it more practical. For this purpose, we have intended both the makespan and total due date cost simultaneously. Total due date cost is included the sum of earliness and
Externí odkaz:
https://doaj.org/article/f90e7b7399e74fcab954869b472cdb90
Autor:
H. Mohammadi-Andargoli, R. Tavakkoli-Moghaddam, N. Shahsavari Pour, M.H. Abolhasani-Ashkezari
Publikováno v:
International Journal of Research in Industrial Engineering, Vol 1, Iss 2, Pp 10-26 (2012)
This paper addresses the permutation of a flexible job shop problem that minimizes the makespan and total idleness as a bi-objective problem. This optimization problem is an NP-hard one because a large solution space allocated to it. We use a duplica
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Akademický článek
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.