Zobrazeno 1 - 8
of 8
pro vyhledávání: '"H. Davain"'
Publikováno v:
Volume 3: Hazardous Waste; Engineered/Geological Barriers in Disposal Systems; L/ILW; Radioactive Waste From Research/Industries; Spent Fuel/HLW Disposal; Public Involvement; Remediation of Uranium Mining/Milling; LL/ILW; Clearance/Exemption Levels; Mgmt. of Fissile Material; HLW; Dismantling; Reversible/Irreversible Disposal; Waste Avoidance/Minimization; Decontamination; Liquid Waste; Radioactive Waste Processing; Transport of Spent Fuel/HLW; Solid HLW Confinement; QA/QC.
The BR3 PWR is a small nuclear power plant (thermal power 40.9 MWth, net electrical power output 10.5 MWe), designed in the late fifties and started in 1962. It was definitely shut down in 1987. In 1989 the BR3 was selected by the European Union as p
Publikováno v:
Volume 2: Mgmt. Low/Interm. Level Waste; Spent Fuel; Economics/Analyses for Waste Mgmt.; Radiological Characterization/Application Release Criteria; Panel Sessions; Solid Waste Reduction/Treatment; Current Activities in Central/Eastern Europe; Environmental Remediation Technology; LL/ILW; HLW/Spent Fuel; Chernobyl; D&D Waste; Performance Assessment; MOX and Spent UOX; D&D Nuclear Reactors; Decommissioning of Other Nuclear Facilities.
SCK•CEN is dismantling its small BR3 PWR reactor. For the management of the contaminated loops, we decided first to decrease the dose rate by a chemical decontamination of the circuits. A complete dismantling of the loops and of the equipment’s f
Publikováno v:
Volume 3: Hazardous Waste; Engineered/Geological Barriers in Disposal Systems; L/ILW; Radioactive Waste From Research/Industries; Spent Fuel/HLW Disposal; Public Involvement; Remediation of Uranium Mining/Milling; LL/ILW; Clearance/Exemption Levels; Mgmt. of Fissile Material; HLW; Dismantling; Reversible/Irreversible Disposal; Waste Avoidance/Minimization; Decontamination; Liquid Waste; Radioactive Waste Processing; Transport of Spent Fuel/HLW; Solid HLW Confinement; QA/QC.
Since 1989, SCK•CEN is dismantling the BR3 (Belgian Reactor no3). During these 11 years of decommissioning, a lot of experience is gained in the field of remotely controlled cutting techniques for high active parts and decontamination techniques of
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.
Conference
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.