Zobrazeno 1 - 10
of 74
pro vyhledávání: '"Gul Polat"'
Publikováno v:
Journal of Engineering, Project, and Production Management, Vol 12, Iss 1, Pp 47-61 (2022)
Reinforced concrete (RC) is used as the primary structural material in almost all construction projects worldwide, from infrastructure to building projects. Since formwork is an essential part of RC construction supply chain, it has a significant imp
Externí odkaz:
https://doaj.org/article/090d3c4ce90549b68f695674f1dc7a56
Autor:
Taylan Terzioglu, Gul Polat
Publikováno v:
Buildings, Vol 12, Iss 8, p 1084 (2022)
The successful completion of reinforced concrete (RC) building construction projects depends, in part, on selecting the appropriate formwork system (FWS) since it may significantly affect the project’s cost, time, and quality performance factors. T
Externí odkaz:
https://doaj.org/article/5e3357f051f24f5dab7c1268aeb009c2
Publikováno v:
Buildings, Vol 12, Iss 2, p 204 (2022)
Selecting the appropriate formwork system (FWS) is a critical aspect in the successful completion of reinforced concrete (RC) building construction projects. The selected FWS has a significant impact on the cost, time, and quality performances of the
Externí odkaz:
https://doaj.org/article/7791192109f5483cb1ceb99cb7b6a02b
Publikováno v:
Buildings, Vol 11, Iss 12, p 618 (2021)
The formwork system (FWS) in reinforced concrete (RC) construction is a critical component. The appropriate FWS is selected based on a number of conflicting and compromising criteria, and the selection of the FWS is carried out by construction profes
Externí odkaz:
https://doaj.org/article/39f0f88182e14cf4b6fb6f068bd5104d
Publikováno v:
Journal of Civil Engineering and Management, Vol 23, Iss 7 (2017)
Materials constitute a large proportion of the total project cost and the absence of right materials in the right quantities and quality on site when needed is one of the most commonly experienced causes of delays in construction projects. Although s
Externí odkaz:
https://doaj.org/article/c3fe0a078bce43f8a50959d9b183ae7c
Autor:
Gul Polat
Publikováno v:
Journal of Civil Engineering and Management, Vol 22, Iss 8 (2016)
On many construction projects, especially building projects, 80–90% of the tasks are performed by subcontractors. Since the success of the project highly depends on the performances of the subcontractors, selecting the right subcontractor for the r
Externí odkaz:
https://doaj.org/article/3e17aafe74354f4e9277489240b64ac8
Impacts of different objective functions on resource leveling in construction projects: a case study
Autor:
Atilla Damci, Gul Polat
Publikováno v:
Journal of Civil Engineering and Management, Vol 20, Iss 4 (2014)
A review of the recent literature on the models that focus on resource leveling in Critical Path Method networks shows that different objective functions have been used to optimize resource utilization. The main objective of this study is to investig
Externí odkaz:
https://doaj.org/article/b5d419ccb5b443ceaa0fc28d90ea2248
Autor:
Gul Polat, Umit Donmez
Publikováno v:
Journal of Civil Engineering and Management, Vol 16, Iss 2 (2010)
Globalization, the restructuring of the world economy, changes experienced in project financing and delivery systems, the pervasive utilization of information and communication technologies (ICT), and the intensity of the competition prevailing in th
Externí odkaz:
https://doaj.org/article/e5f63c7e50fb4d73bd99fcbbede94b07
Autor:
Gul Polat
Publikováno v:
Journal of Civil Engineering and Management, Vol 16, Iss 1 (2010)
Precast concrete technology is recognized worldwide as offering significant advantages. Despite the advantages they offer, precast concrete building systems’ share in both Turkey and the U.S. is very low, especially when compared to many European c
Externí odkaz:
https://doaj.org/article/4b4586495b144a9e833052ba6a509f36
Publikováno v:
International Journal of Construction Management. :1-13