Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Guisong Hu"'
Publikováno v:
Underground Space, Vol 11, Iss , Pp 204-217 (2023)
With tunnel boring machine being used in underground engineering, accurate geological indicators have been the important basis for tunnel boring machine (TBM) construction. Back propagation neural network (BPNN) has been used to predict the geologica
Externí odkaz:
https://doaj.org/article/13571aa8eec642eb8dad637f4c0f6240
Publikováno v:
Journal of Computer Engineering & Applications; 2020, Vol. 56 Issue 21, p204-209, 6p
Selected, peer reviewed papers from the 2014 International Conference on Advances in Materials Science and Information Technologies in Industry (AMSITI 2014), January 11-12, 2014, Xi'an, China