Zobrazeno 1 - 2
of 2
pro vyhledávání: '"Govert L. Kruijtzer"'
Autor:
Mrudula Paranjape, AS Norske Shell, Thomas Krebs, Godwin Okoh, Boubker Ibohouten, Isaac Anayo Ogazi, Govert L. Kruijtzer, Richard Arntzen, Paul Verbeek, Reda Akdim, Wouter F. Balk
Publikováno v:
Day 2 Tue, November 08, 2016.
The Bonga FPSO was designed to process 280 MBLPD gross liquid, constrained by the three-phase low pressure (LP) separator capacity. The projected production forecast indicated that additional future volumes of produced fluids from the Bonga field cou
Autor:
B. Ibouhouten, K. Ciprick, Paul Verbeek, S. Arreola, Adekunle Olutayo Opawale, Govert L. Kruijtzer, Mohamed Reda Akdim
Publikováno v:
Day 2 Tue, November 08, 2016.
Wellhead desanding may increase the productivity of an oil/gas well as it opens the opportunity to a minimized choked-back production. Utilizing a wellhead desanding system upstream of the choke valve, minimizes the risk of erosion of the downstream