Zobrazeno 1 - 10
of 11
pro vyhledávání: '"Gonzalo Nelis"'
Publikováno v:
Results in Engineering, Vol 25, Iss , Pp 103576- (2025)
The migration of fines in block caving mining corresponds to the movement of small-size granular material. This material is directed toward drawpoints, causing dilution of valuable mineral and safety concerns due to the formation of cohesive arcs. Al
Externí odkaz:
https://doaj.org/article/205e7eafe0ce4bc7b5d1d2d41afc17a9
Publikováno v:
Mathematics, Vol 11, Iss 18, p 3907 (2023)
The strategic planning of open pit operations defines the best strategy for extraction of the mineral deposit to maximize the net present value. The process of strategic planning must deal with several sources of uncertainty; therefore, many authors
Externí odkaz:
https://doaj.org/article/dc584bc02f6d41bea832b91ad55090a6
Publikováno v:
Mining, Metallurgy & Exploration. 39:2393-2400
Publikováno v:
Resources Policy. 83:103703
Autor:
Gonzalo Nelis, Nelson Morales
Publikováno v:
Optimization and Engineering. 23:233-257
Short-term open pit planners have to deal with the task of designing a feasible production schedule. This schedule must fulfill processing, mining and operational constraints and, at the same time, maximize the profit or total metal produced. It also
Publikováno v:
SSRN Electronic Journal.
Publikováno v:
Resources Policy. 81:103340
In this work we propose a novel approach to solve the mining cut definition problem in open pit mines with geometallurgical interactions. Mining cut definition deals with the aggregation of blocks into clusters which are extracted and processed as a
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::eb2ba9b2b688860f6b7602c62cc27b56
https://hal.archives-ouvertes.fr/hal-03279919/file/Clustering-hal.pdf
https://hal.archives-ouvertes.fr/hal-03279919/file/Clustering-hal.pdf
Publikováno v:
Computers & Geosciences. 121:23-29
Traditional practice in mine planning often relies on estimation techniques that fail to account for the intrinsic uncertainty of geology and grades, which may have significant consequences in the mine operation. Dealing with this uncertainty has bee
Publikováno v:
Optimization and Engineering. 17:813-832
A new algorithm for the optimal stope design problem is proposed. It is based on a previous methodology developed by Bai et al. (Comput Geosci 52:361–371, 2013a) where a cylindrical coordinate system is used to define geomechanical restrictions and