Zobrazeno 1 - 7
of 7
pro vyhledávání: '"Goldratt's method"'
Autor:
Połoński, Mieczysław
Publikováno v:
Budownictwo i Architektura / Civil Engineering and Architecture. 13(4):389-397
Externí odkaz:
https://www.ceeol.com/search/article-detail?id=905643
Autor:
Połoński, Mieczysław
Publikováno v:
Budownictwo i Architektura / Civil Engineering and Architecture. 12(1):47-52
Externí odkaz:
https://www.ceeol.com/search/article-detail?id=907431
Autor:
Połoński M., Pruszyński K.
Publikováno v:
Archives of Civil Engineering, Vol 59, Iss 3, Pp 313-320 (2013)
The introduction of a baseline term to the dependency network most often results in a change, break and/or generation of a new sequence of critical path, depending on the type of such a baseline term and the exact date selected. Each of those situati
Externí odkaz:
https://doaj.org/article/87252b84890d45159985192389d2e87e
Autor:
Mieczysław Połoński
Publikováno v:
Budownictwo i Architektura, Vol 13, Iss 4 (2014)
The proposed method presented in this article concerns cost estimating of projects, including contingency. It points to the possibility of application of time buffers for this purpose. From the practical point of view, the enhanced calculation at the
Externí odkaz:
https://doaj.org/article/221fa39d95914988989186357d6f5d9f
Autor:
Mieczysław Połoński
Publikováno v:
Budownictwo i Architektura, Vol 12, Iss 1 (2013)
The methodology of development of building project schedules, proposed in the article, is based on an attempt to combine two independent approaches in order to increase the probability of fulfillment of time limits planned in the CPM schedules during
Externí odkaz:
https://doaj.org/article/562f2eb3031944a4a4033c26479ceef8
Implementation of the construction projects is associated with significant current material, technical and financial costs. They increase significantly in case of the breaking deadlines the large stages of projects and putting buildings into operatio
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::ea5df1566e5e1b4d7f17ecb1c0b8764e
Autor:
Mieczysław Połoński, K. Pruszyński
Publikováno v:
Archives of Civil Engineering, Vol 59, Iss 3, Pp 313-320 (2013)
The introduction of a baseline term to the dependency network most often results in a change, break and/or generation of a new sequence of critical path, depending on the type of such a baseline term and the exact date selected. Each of those situati