Zobrazeno 1 - 1
of 1
pro vyhledávání: '"Gerard Aden"'
Publikováno v:
Day 4 Thu, November 15, 2018.
The ∼18 km long 10" pipeline was installed by MCDERMOTT as part of a gas export modification development in the Gulf of Mexico. The pipeline was initiated with a 97 Te dual-hub PLEM at a water depth of 1535 m. The fast track nature of the project r