Zobrazeno 1 - 10
of 76
pro vyhledávání: '"Geert-Jan van Houtum"'
Publikováno v:
INFORMS Journal on Applied Analytics, 52(5), 460-470. INFORMS Institute for Operations Research and the Management Sciences
ASML is an innovation leader in the semiconductor industry and the market leader in the photolithography systems sector. At the beginning of 2017, ASML embarked on a journey to evaluate and reform its after-sales service supply concept driven by the
Publikováno v:
European Journal of Operational Research, 301(3), 1007-1020. Elsevier
We consider a system with a finite lifespan and a single critical component that is subject to random failures. An age-based replacement policy is applied to preventively replace the component before its failure. The components used for replacement c
Publikováno v:
Applied Stochastic Models in Business and Industry, 39(1), 68-70. Wiley
As a contribution to the discussion of the paper An overview of some classical models and discussion of the signature-based models of preventive maintenance,1 we consider the assumption of exchangeability of the failure times of components in systems
Publikováno v:
Service Science. INFORMS Institute for Operations Research and the Management Sciences
We consider a physical asset consisting of complex systems, where the systems may require upgrades during the lifetime of the asset. In practice, the asset owner and system supplier can make the upgrade decisions together, requiring a decision-suppor
Publikováno v:
Production and Operations Management, 30(6), 1615-1632. Wiley-Blackwell
We investigate the benefits of on-site printing at remote geographic locations, where access to spare parts is intermittent and supplies are replenished at fixed intervals. Organizations typically have no solution to spare parts shortages other than
Publikováno v:
IISE Transactions, 53(10), 1067-1080. Informa UK Limited
This article investigates spare parts service contracts for capital goods. We consider a single-item, single-location inventory system that serves one customer with multiple machines. During the contract execution phase, the true demand rate is obser
Publikováno v:
IEEE Transactions on Semiconductor Manufacturing, 33(4):9087883, 504-510. Institute of Electrical and Electronics Engineers
We are interested in the influence of spare part service measures on the performance of the front-end wafer fabrication process. This process is characterized by re-entrant flows due to the multiple layers present on chips. This exacerbates the effec
Publikováno v:
European Journal of Operational Research, 285(2), 583-598. Elsevier
We address the problem of dispatching and pro-actively repositioning service resources in service networks such that fast responses to service requests are realized in a cost-efficient way. By formulating this problem as a Markov decision process, we
Publikováno v:
Manufacturing & Service Operations Management, 22(1), 36-46. INFORMS Institute for Operations Research and the Management Sciences
We present a reproducible, objective review of research trends using text mining and citations of papers published in Manufacturing & Service Operations Management during its first 20 years whose abstracts or keywords contain capacity or inventory. T