Zobrazeno 1 - 10
of 71
pro vyhledávání: '"G E, Gibson"'
Publikováno v:
Journal of Management in Engineering. 25:29-39
In the United States, public agencies are adopting the design-build (DB) delivery method for delivering highway projects after having used the traditional design-bid-build method for generations. In the 2002 design-build contracting final rule, the F
Autor:
M. Safa, A. Sabet, S. MacGillivray, M. Davidson, K. Kaczmarczyk, C. T. Haas, G. E. Gibson, D. Rayside
In order to address construction project requirements and specifications, scholars and practitioners need to establish taxonomy according to a scheme that best fits their need. While existing characterization methods are continuously being improved,
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::8b468a725897af2a702bae2422c98ac6
Autor:
G. E. Gibson, A. F. Griffith
Publikováno v:
Journal of Management in Engineering. 17:69-76
Many projects suffer when project participants are in disagreement as to the proper success emphasis or goals for the project. These differences in success emphasis are a result of poor team alignment. Alignment can be defined as the condition where
Publikováno v:
Automation in Construction. 6:193-203
Fundamental advances in sensors, actuators, and control systems technology are creating opportunities to improve the performance of traditional construction equipment. New capabilities are being developed as well. These improvements in performance an
Publikováno v:
Journal of Construction Engineering and Management. 122:274-280
Constructability is defined as the optimum use of construction knowledge and experience in planning, design, procurement, and field operations to accomplish project objectives. Ideally, constructability should be initiated early in the conceptual des
Autor:
M. R. Hamilton, G. E. Gibson
Publikováno v:
Journal of Management in Engineering. 12:25-33
Benchmarking key performance areas is key to continual improvement of processes. This paper focuses on measurement and benchmarking of the preproject-planning process for capital construction. While experienced members of the construction industry re
Publikováno v:
Journal of Construction Engineering and Management. 121:312-318
Preproject planning is defined as the process of developing sufficient strategic information for owners to address risk and decide whether to commit resources to maximize the change for a successful capital facility project. Preproject planning—als
Autor:
G. E. Gibson, J. A. Joseph
Publikováno v:
Handbook of Neurochemistry and Molecular Neurobiology ISBN: 9780387303666
Handbook of Neurochemistry and Molecular Neurobiology
Handbook of Neurochemistry and Molecular Neurobiology
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::dd048146fa8c07e0631bb0cabdf8277c
https://doi.org/10.1007/978-0-387-30411-3_12
https://doi.org/10.1007/978-0-387-30411-3_12
Publikováno v:
Journal of neurochemistry. 76(4)
Recent etiological study in twins (Tanner et al. 1999) strongly suggests that environmental factors play an important role in typical, non-familial Parkinson's disease (PD), beginning after age 50. Epidemiological risk factor analyses of typical PD c
Publikováno v:
Journal of the European Academy of Dermatology and Venereology : JEADV. 10(1)
Renal transplant recipients have an increased incidence of skin cancers, which may be multiple and aggressive.The purpose of this study was to examine the chemoprophylactic effects of low-dose etretinate (0.3 mg/kg/day) on skin cancer development in