Zobrazeno 1 - 10
of 12
pro vyhledávání: '"Furkan Uysal"'
Publikováno v:
Buildings, Vol 13, Iss 11, p 2738 (2023)
In this paper, we present a novel memetic algorithm (MA) for the solution of the resource leveling problem (RLP). The evolutionary framework of the MA is based on integration of a genetic algorithm and simulated annealing methods along with a resourc
Externí odkaz:
https://doaj.org/article/4e234e88c14e4895861ef7883457fc73
Autor:
Furkan Uysal, Rifat Sonmez
Publikováno v:
Buildings, Vol 13, Iss 3, p 651 (2023)
Conceptual cost estimation is an important step in project feasibility decisions when there is not enough information on detailed design and project requirements. Methods that enable quick and reasonably accurate conceptual cost estimates are crucial
Externí odkaz:
https://doaj.org/article/a22c567ac39248dcb656d410d4746f10
Publikováno v:
Journal of Applied Research on Industrial Engineering, Vol 5, Iss 1, Pp 39-49 (2018)
Despite the dynamic nature of real life scheduling problems, few studies focus on stochastic resource constrained project scheduling problem and its variants. In this study, we consider stochastic resource possibilities and propose a new chance const
Externí odkaz:
https://doaj.org/article/43b5e31a71ef439a913ae2035c65ee8a
Publikováno v:
Transportation Letters. :1-12
Autor:
Uğur Cavlak, Beliz Belgen Kaygisiz, Furkan Uysal, Buyuk Adim Ozel Egitim ve Rehabilitasyon Merkezi, Amasya, Turkiye
Publikováno v:
Archives of Health Science and Research. 8:33-38
Publikováno v:
SSRN Electronic Journal.
In this article, we present a parallel graphical processing unit (GPU)-based genetic algorithm (GA) for solving the resource-constrained multi-project scheduling problem (RCMPSP). We assumed that activity pre-emption is not allowed. Problem is modele
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_dedup___::89013ea0be1cce1aa001c503916aeab8
https://avesis.gazi.edu.tr/publication/details/ba3025eb-4860-4c7a-b822-49900048f2e8/oai
https://avesis.gazi.edu.tr/publication/details/ba3025eb-4860-4c7a-b822-49900048f2e8/oai
Autor:
Rifat Sonmez, Furkan Uysal
Publikováno v:
Journal of Construction Engineering and Management. 147
Publikováno v:
Journal of Construction Engineering and Management. 142
Despite the importance of project deadlines and resource constraints in construction scheduling, very little success has been achieved in solving the resource-constrained discrete time–cost...
Autor:
Rifat Sonmez, Furkan Uysal
Publikováno v:
Journal of Computing in Civil Engineering. 29
Despite the fact that companies manage multiple projects simultaneously, most research on resource-constrained project scheduling has focused on single projects. This paper presents a backward-forward hybrid genetic algorithm (BFHGA) for optimal sche