Zobrazeno 1 - 10
of 34
pro vyhledávání: '"Fuchuan Duan"'
Publikováno v:
IET Electrical Systems in Transportation, Vol 12, Iss 4, Pp 238-250 (2022)
Abstract With the increase of train speed in electrified railways, the increasingly violent interaction of pantograph–catenary (PC) makes the PC detachment arc an extrusive phenomenon, especially in the double‐pantograph–catenary (DPC) system.
Externí odkaz:
https://doaj.org/article/cb614110f63e4de9b87a8f29cd7ddf4b
Publikováno v:
Sensors, Vol 24, Iss 3, p 976 (2024)
Railway catenary galloping, induced by aerodynamic instability, poses a significant threat by disrupting the electric current connection through sliding contact with the contact wire. This disruption leads to prolonged rail service interruptions and
Externí odkaz:
https://doaj.org/article/720b0d0730114babb8cc0b52a92fd867
Publikováno v:
IET Electrical Systems in Transportation, Vol 12, Iss 2, Pp 128-142 (2022)
Abstract The electric spark caused by pantograph‐catenary (PC) electrical contact failure happens frequently, it is a kind of arcing phenomenon which can severely affect the current collection of PC. The theoretical analysis and modelling of PC ele
Externí odkaz:
https://doaj.org/article/b16151da648e4c7db8fa5f3d4e399a55
Publikováno v:
IET Electrical Systems in Transportation, Vol 11, Iss 3, Pp 269-277 (2021)
Abstract To improve the carrying capacity, double pantographs are normally used to collect the electric current from the catenary. The mechanical wave excited by the leading pantograph affects the contact of the trailing pantograph and the contact wi
Externí odkaz:
https://doaj.org/article/d4202179d19c49278b4902a49063e810
Publikováno v:
Sensors, Vol 23, Iss 15, p 6797 (2023)
This study focuses on developing a comprehensive model of a rigid overhead system, which includes essential components such as the suspension structure, positioning clamp, and expansion joint. The modelling approach utilizes finite element theory and
Externí odkaz:
https://doaj.org/article/c867db10ee82494286c483f75f75df16
Publikováno v:
Journal of Low Frequency Noise, Vibration and Active Control, Vol 40 (2021)
When two electric multiple units are non-electrically connected together for improving the transport capacity in high-speed railways, double pantographs frequently operate simultaneously to decrease the current capacity on a single pantograph collect
Externí odkaz:
https://doaj.org/article/948794f092fd4e5d853a59c0c609f388
Publikováno v:
Shock and Vibration, Vol 2021 (2021)
The numerical tools can be used to facilitate the design of the railway pantograph-catenary system. The validation of the current numerical results is mostly performed at a speed slower than 350 km/h. This paper aims at the validation and analysis of
Externí odkaz:
https://doaj.org/article/2809dcf8a25a4faebdaf7acd627577b1
Publikováno v:
Sensors, Vol 20, Iss 14, p 3984 (2020)
The vibration of the catenary that is initiated by the passing pantograph has a direct influence on the pantograph–catenary contact performance. Monitoring the dynamic uplift of the catenary can help inspectors to evaluate the railway operation con
Externí odkaz:
https://doaj.org/article/731b319e368b4ca7aebd2a59556f4e8e
Publikováno v:
Vehicle System Dynamics. :1-24
Publikováno v:
Sustainability; Volume 15; Issue 8; Pages: 6803
This paper aims to enhance the speed of rigid overhead systems by investigating the impact of important parameters of the overhead system and pantograph on the interaction performance, specifically the contact force between the panhead of the pantogr