Zobrazeno 1 - 9
of 9
pro vyhledávání: '"Frode Vassenden"'
Autor:
Lars Rasmussen, M. G. Aarra, Frode Vassenden, Harald K. Celius, Helge Andre Martinsen, Tore Blaker, Arne Skauge
Publikováno v:
SPE Reservoir Evaluation & Engineering. 5:317-323
SummaryThe Foam Assisted Water Alternating Gas (FAWAG) project has been a full-scale field demonstration of foam for gas mobility control. It was carried out in the Snorre field on the Norwegian Continental Shelf from 1997 to 2000, with support from
Publikováno v:
SPE Reservoir Evaluation & Engineering. 2:436-441
SummaryFoam propagation in co-injection of gas and surfactant solution has been studied in a 10-m-long flow apparatus, equipped with pressure ports and fluid sampling valves for every 1 m. The data have been compared to the results of a core scale fo
Autor:
Elling Sletfjerding, Frode Vassenden, Erlend Hovde, Thomas Rage Lerdahl, Gigi Alexandra Sand, Svein Mjaaland, Paul Aage Storoe, Vigdis Viken
Publikováno v:
All Days.
The Asgard licence, operated by Statoil, has been a major user of light well intervention (LWI) services since 2003. Based on the value of the results, this subsea field will continue using LWI as a reservoir management tool in the future. The main f
Autor:
Frode Vassenden, Mette Rian, Vigdis Viken, Frank Moeller Nielsen, Øyvind Gustavsen, Andreas Haldoupis
Publikováno v:
All Days.
Two of 19 wells were lost to carbonate scale in a high-temperature gas condensate field with commingled production. The problem was identified as tubing plugging. Plugging was caused by a 6-8 °C heating of water from the shallow interval when mixed
Publisher Summary This chapter illustrates an injection scenario that includes most of the Norwegian oil reservoirs in the North Sea oil reservoir. In order to elucidate the possibility of combining CO 2 storage with EOR, a techno-economic model for
Externí odkaz:
https://explore.openaire.eu/search/publication?articleId=doi_________::fe7ff4aabe86094bec56cd1a5bc086fd
https://doi.org/10.1016/b978-008044704-9/50040-9
https://doi.org/10.1016/b978-008044704-9/50040-9
Publikováno v:
All Days.
Downhole Permanent Monitoring and Control Systems invoke the vision of adapting real-time process control to the hydrocarbon drainage process. This paper discusses some aspects of the evolution towards that vision. Three functions of Reservoir Manage
Publikováno v:
All Days.
Foam propagation in co-injection was studied in a 10 m long porous medium, equipped with pressure ports for every 1 m. The porous medium had been characterized by flooding experiments on the core scale. In the absence of oil, propagation on the 10 m
Autor:
Gunnar Aronsen, Frode Vassenden
Publikováno v:
Energy Procedia. :149-156
It has been found that a simple fixed delay of the water along a river does not provide accurate enough river flow rates for scheduling of the river power plants. One problem is that production water seems to disappear along the river stretch. Anothe
Tento výsledek nelze pro nepřihlášené uživatele zobrazit.
K zobrazení výsledku je třeba se přihlásit.
K zobrazení výsledku je třeba se přihlásit.