Zobrazeno 1 - 3
of 3
pro vyhledávání: '"Frank Plumptre"'
Autor:
J. Afonso, G. Gresko, G. Sessler, Michael J. Thompson, B. Mackie, John T. Tengdin, Kevin Donahoe, W. McCannon, G. Santerre, Bogdan Z. Kasztenny, M. Sachdev, Mark Allen, Alla Deronja, D. Fontana, Charles Sufana, M. Best, R. Whittaker, D.S. Miller, Frank Plumptre, R. Crellin, S. Chano, James R. O’Brien, R. Hedding, F. Balasiu, D.A. Tziouvaras, D. Tholomier, L. Henriksen
Publikováno v:
2011 64th Annual Conference for Protective Relay Engineers.
The IEEE/PSRC Substation Protection Subcommittee Working Group (WG) K5 on Ancillary Protective and Control Functions Common to Multiple Protective Relays have produced a document that addresses the considerations in applying the ancillary protection,
Autor:
Larry Henriksen, Art Buanno, Bill Kennedy, Hyder DoCarmo, Solveig Ward, George Gresko, Alla Deronja, Mukesh Nagpal, Elmo Price, Walter McCannon, Ilia Voloh, Mark Simon, Bogdan Z. Kasztenny, RJ Young, Albert N. Darlington, Gary Kobet, James R. O’Brien, Kazik Kuras, Mark Allen, Vahid Madani, John Miller, Sam Sambasivan, Jian Cheng Tan, Frank Plumptre, Mike Jensen, Mike McDonald, Jerry Finley
Publikováno v:
2010 63rd Annual Conference for Protective Relay Engineers.
This paper concerns the justification of the use of pilot protection on transmission lines.
Publikováno v:
2009 62nd Annual Conference for Protective Relay Engineers.
The BC Hydro transmission network includes 33 wholly owned 500 kV circuits and three 500 kV interconnections with other utilities. Eleven of these lines include series compensation, and many were upgraded to provide single-pole tripping (SPT) capabil