Zobrazeno 1 - 10
of 10
pro vyhledávání: '"Ferda Can Çetinkaya"'
Autor:
Atıl Kurt, Ferda Can Çetinkaya
Publikováno v:
International Journal of Industrial Engineering and Management, Vol 15, Iss 1, Pp 18-33 (2024)
This study considers the scheduling problem of multiple independent and non-resumable jobs on unrelated parallel machines subject to machine availability and eligibility constraints. For each machine, there is a maximum continuous working time due to
Externí odkaz:
https://doaj.org/article/8d1a84c36e344ef997591f4c0a8de27d
Publikováno v:
Decision Science Letters, Vol 12, Iss 2, Pp 315-332 (2023)
This study considers an integrated inventory planning and distribution problem based on an applied case at the Turkish Red Crescent’s Central Anatolian Regional Blood Center. We define two echelons, the first echelon being the regional blood center
Externí odkaz:
https://doaj.org/article/227c169deb5a41299011bb1334e3301a
Publikováno v:
International Journal of Industrial Engineering and Production Research, Vol 33, Iss 2, Pp 1-17 (2022)
This paper considers a customer order scheduling (COS) problem in which each customer requests a variety of products processed in a two-machine flow shop. A sequence-independent attached setup for each machine is needed before processing each product
Externí odkaz:
https://doaj.org/article/348c398b37c44dadb3ac9955b1fd63de
Autor:
Ferda Can Çetinkaya
Publikováno v:
Operational Research in Engineering Sciences: Theory and Applications. 4:142-175
Lot streaming is splitting a job-lot of identical items into several sublots (portions of a lot) that can be moved to the next machines upon completion so that operations on successive machines can be overlapped; hence, the overall performance of a m
Publikováno v:
International Journal of Industrial Engineering Computations, Vol 12, Iss 3, Pp 273-292 (2021)
This study considers a customer order scheduling (COS) problem in which each customer requests a variety of products (jobs) processed on a single flexible machine, such as the computer numerical control (CNC) machine. A sequence-independent setup for
Publikováno v:
South African Journal of Industrial Engineering, Vol 30, Iss 1, Pp 78-93 (2019)
This paper considers a single-machine scheduling problem of multi- operation jobs where each job consists of several operations processed contiguously, rather than being intermingled with the operations of different jobs. That is, the jobs are indivi
Publikováno v:
European journal of industrial engineering, 13(3), 332-367. Inderscience Publishers
This paper considers the blood distribution problem in the Central Anatolian Regional Blood Centre of the Turkish Red Crescent (TRC) and proposes several demand satisfaction options considering the irradiation centres, urgent demands, and product ava
Publikováno v:
European J. of Industrial Engineering. 12:405
This paper considers the blood distribution problem that includes irradiation centres, urgent demands, and product availability in Turkey, Central Anatolian Regional Blood Center of the Turkish Red Crescent. To address the problem, we develop a mixed
Publikováno v:
European J. of Industrial Engineering. 9:450
In this study, we consider a multi-mode resource allocation problem with a single non-renewable resource. We assume the resource is released at defined time points and at defined quantities. We also assume that the activity costs are charged once the
Autor:
Ferda Can Çetinkaya
Publikováno v:
The Journal of the Operational Research Society. 45:1445
This paper considers the job (lot) scheduling problem for two-stage flow shops in which the movement of transfer batches (sublots) from the first stage to the next are allowed. Set-up, processing and removal times are considered as separable and inde